- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
Small Composite Cleanroom Modification
Presolicitation from DEPT OF THE AIR FORCE • DEPT OF DEFENSE. Place of performance: OK. Response deadline: Apr 14, 2026. Industry: NAICS 238220 • PSC J041.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 238220 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 40 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS 238220
Description
** THIS IS A PRE-SOLICITATION NOTICE. NO QUOTES WILL BE ACCEPTED UNTIL THE REQUEST FOR QUOTE (RFQ) IS POSTED. **
Description of Services: The 76th CMXG request services to furnish and install an Environmental Control Air Handling Unit to be mounted on the floor outside and adjacent to the room. This unit is 54” wide x 31” deep x 74” high. It is a chilled water up flow, 25KW 3-phase, 460v unit that will include chilled water coil, belt drive blower, humidifier, reheat, filters, with controls and monitoring to integrate with Tinker AFB’s network.
- It will include a 15KW electric reheat, 1”, 3-way modulating chilled water valve, 1”, temperature/humidity sensor mounted on the unit, bottom return air, MERV 8 filters, 10 lb/hr steam humidifier, floor stand, and condensate probe.
- Furnish and install overhead ducted system with 6 diffusers
- Furnish and install low sidewall return
- Furnish and install one 10’ x 8’ high-speed, fabric, roll up door along 40’ side of room
- Furnish and install four process vacuum ports – TAFB to provide connection within 25’
- Furnish and install two central vacuum ports – TAFB to provide connection within 25’
- Furnish and install four compressed air ports – TAFB to provide connection within 25’
- Furnish and install one drainless eye wash station
- Furnish and install BACnet devices and monitoring system to track room temperature,
- pressure, humidity, and particle count - TAFB to connect data collection equipment to
- network.
- Tinker Air Force Base (TAFB) to provide 460 v/3-phase power supply within 25’ for:
- AHU – 25kw, 3ph, 480 volt
- Door – 480 volt, 3 ph, 20 amp circuit
The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform the upgrade to the Small Composite Cleanroom located on TAFB.
The Contractor shall be responsible for ensuring all services, parts and Original Equipment Manufacturer (OEM) components provided are in accordance with (IAW) the terms and conditions outlined herein, conform to the manufacturer’s equipment specifications and the Performance Work Statement (PWS).
Contemplated Contract Details:
- Firm-fixed price (FFP)
- 100% Small Business Set-Aside, Competitive
- NAICS – 238220; Size Standard – $19M; FSC/PSC – J041
Eligibility for Award:
- System for Award Management (SAM) is required to receive any award. Vendors can register electronically at https://sam.gov/content/home.
- NIST SP 800-171 DoD Assessment: In order to be considered for award, if the Offeror is required to implement NIST SP 800–171, the Offeror shall have a current assessment ( i.e., not more than 3 years old unless a lesser time is specified in the solicitation) (see 252.204–7020) for each covered contractor information system that is relevant to the offer, contract, task order, or delivery order. The Basic, Medium, and High NIST SP 800–171 DoD Assessments are described in the NIST SP 800–171 DoD Assessment Methodology located at https://www.acq.osd.mil/asda/dpc/cp/cyber/docs/safeguarding/NIST-SP-800-171-Assessment-Methodology-Version-1.2.1-6.24.2020.pdf. In pursuant to DFARS 252.204-7019, the summary level score of 110 is expected.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.