Skip to content
Department of Energy

Milli-Kelvin Scanning Probe Microscope

Solicitation: BSA473768
Notice ID: 660f3ea93a474317a0c9e28a7dae917b
TypeSolicitationNAICS 334516PSC6635Set-AsideNONEDepartmentDepartment of EnergyStateNYPostedApr 02, 2026, 12:00 AM UTCDueApr 18, 2026, 04:00 AM UTCCloses in 15 days

Solicitation from ENERGY, DEPARTMENT OF • ENERGY, DEPARTMENT OF. Place of performance: NY. Response deadline: Apr 18, 2026. Industry: NAICS 334516 • PSC 6635.

Market snapshot

Awarded-market signal for NAICS 334516 (last 12 months), benchmarked to sector 33.

12-month awarded value
$18,900,300
Sector total $48,254,503,961 • Share 0.0%
Live
Median
$1,816,675
P10–P90
$1,270,015$2,363,335
Volatility
Moderate60%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
0.0%
share
Momentum (last 3 vs prior 3 buckets)
+109%($6,647,650)
Deal sizing
$1,816,675 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for NY
Live POP
Place of performance
Upton, New York • 11973 United States
State: NY
Contracting office
Upton, NY • 11973 USA

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
NY20260002 (Rev 1)
Match signal: state matchOpen WD
Published Jan 30, 2026New York • Albany, Columbia, Fulton +7
Rate
Asbestos/Insulator Worker SCOPE OF WORK: includes application of all insulating materials, protective, coverings, coating and finishing to all types of mechanical systems
Base $41.74Fringe $27.58
Rate
HANDLER Duties limited to preparation wetting; stripping; removal; scrapping; vacuuming; bagging; and disposing of all insulation materials, whether they contain asbestos or not from mechancial systems
Base $41.74Fringe $27.58
+91 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 91 more rate previews.
Davis-BaconBest fitstate match
NY20260002 (Rev 1)
Open WD
Published Jan 30, 2026New York • Albany, Columbia, Fulton +7
Rate
Asbestos/Insulator Worker SCOPE OF WORK: includes application of all insulating materials, protective, coverings, coating and finishing to all types of mechanical systems
Base $41.74Fringe $27.58
Rate
HANDLER Duties limited to preparation wetting; stripping; removal; scrapping; vacuuming; bagging; and disposing of all insulation materials, whether they contain asbestos or not from mechancial systems
Base $41.74Fringe $27.58
Rate
BOILERMAKER
Base $43.34Fringe $27.66
+90 more occupation rates in this WD
Davis-Baconstate match
NY20260012 (Rev 1)
Open WD
Published Jan 30, 2026New York • Nassau, Suffolk
Rate
Asbestos Workers/Insulator Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems
Base $71.76Fringe $36.81
Rate
HAZARDOUS MATERIAL HANDLER
Base $47.75Fringe $13.70
Rate
BOILERMAKER
Base $68.88Fringe $49.83
+52 more occupation rates in this WD
Davis-Baconstate match
NY20260034 (Rev 1)
Open WD
Published Jan 30, 2026New York • Orleans
Rate
gs, coatings, and finishes to all types of mechanical systems. Also, the application of firestooping material openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement)
Base $40.26Fringe $25.41
Rate
NDLER Duties limited to Preparation; wetting; stripping; removal; scrapping; vacuuming; bagging; and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems
Base $40.26Fringe $25.41
Rate
BOILERMAKER
Base $39.35Fringe $33.18
+50 more occupation rates in this WD
Davis-Baconstate match
NY20260049 (Rev 1)
Open WD
Published Jan 30, 2026New York • Orange
Rate
HANDLER (Duties limited to preparation, wetting, stripping, removal, scraping, vacuuming, bagging and disposing of all insulation materials whether they contain asbestos or not from mechanical systems)
Base $46.62Fringe $49.30
Rate
Insulator/asbestos worker (Includes application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $46.62Fringe $49.30
Rate
Bricklayer, Cement Mason, Plasterer
Base $43.04Fringe $34.99
+17 more occupation rates in this WD

Point of Contact

Name
Mark Brock
Email
mbrock@bnl.gov
Phone
6313442713

Agency & Office

Department
ENERGY, DEPARTMENT OF
Agency
ENERGY, DEPARTMENT OF
Subagency
BROOKHAVEN NATL LAB -DOE CONTRACTOR
Office
Not available
Contracting Office Address
Upton, NY
11973 USA

More in NAICS 334516

Description

BSA is procuring a Milli-Kelvin Scanning Probe Microscope. The mK-SPM instrument, shall operate tuning-fork-based atomic force microscopy (TFAFM) and be designed to support optimum operation of scanning Microwave Impedance Microscopy (sMIM) and Scanning Resonator Microscopy (SRM) at a base temperature <= 20 mK inside a fully shielded low noise environment within high vacuum (HV).

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.