Skip to content
Davis-Bacon

NY20260034 (Rev 1)

Coverage: New York • Orleans.

Published: Jan 30, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
gs, coatings, and finishes to all types of mechanical systems. Also, the application of firestooping material openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement)$40.26$25.41
NDLER Duties limited to Preparation; wetting; stripping; removal; scrapping; vacuuming; bagging; and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems$40.26$25.41
BOILERMAKER$39.35$33.18
BRICKLAYER BUILDING CONSTRUCTION BRICKLAYERS, STONE MASONS, PLASTERERS, CEMENT MASONS, POINTER, CLEANER & CAULKERS$37.44$32.71
MARBLE TILE AND TERRAZZO WORKERS$37.85$31.80
MARBLE, TILE AND TERRAZZO FINISHERS$35.71$18.26
HEAVY/HIGHWAY CONSTRUCTION CEMENT MASONS$38.63$25.05
CARPENTER$34.26$25.94
MILLWRIGHT$31.93$25.11
ELECTRICIAN$44.30$5.50
CABLE SPLICER$37.40$27.44
ELECTRICIAN$44.20$32.90
Power equipment operators: BUILDING/HEAVY AND HIGHWAY GROUP 1$44.23$35.40
GROUP 2$39.14$35.40
GROUP 3$47.48$35.40
GROUP 4$48.48$35.40
GROUP 5$48.98$35.40
GROUP 6$49.48$35.40
GROUP 7$45.47$35.40
Ironworkers: IRONWORKER$36.25$33.12
SHEETER$36.25$33.12
Ironworkers: Ornamental, Reinforcing Stone Derrickman, Rigger, Rodman, Structural, Machinery Movers, Fence Erectors, Precast Concrete Erector$35.75$30.80
Sheeter$36.00$30.80
Laborers: BUILDING: Blaster$30.40$21.49
Chuck tender$29.27$21.49
Concrete vibrators$29.51$21.49
Hazardous waste removal$30.07$21.49
Pipe layers, burners and cutters$29.37$21.49
Powder Monkey$29.94$21.49
Unskilled Laborer$29.07$21.49
Yardman, clean-up$26.22$21.49
HEAVY/HIGHWAY GROUP 1$32.96$25.30
GROUP 2$33.66$25.30
GROUP 3$33.86$25.30
GROUP 4$34.69$25.30
GROUP 5$35.44$25.30
PAINTER BRUSH & ROLLER$33.00$28.21
DRYWALL/TAPING$34.00$28.51
HEAVY & HIGHWAY CONSTRUCTION$38.50$28.40
WALLCOVERING$33.00$28.21
GLAZIER$34.68$27.64
Plumber and Steamfitter$42.68$27.88
Plumber and Steamfitter ZONE 1$42.20$29.80
Roofers: Composition$34.96$26.03
Slate & Tile$35.11$26.03
SPRINKLER FITTER$47.85$28.94
Sheet metal worker$39.50$29.18
Truck drivers: GROUP 1$31.39$27.77
a GROUP 2$31.44$27.77
a GROUP 3$31.49$27.77
a GROUP 4$31.64$27.77
a GROUP 5$31.79$27.77
Truck drivers$49.23$8.75

Related Wage Determinations

View directory →