Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
HANDLER (Duties limited to preparation, wetting, stripping, removal, scraping, vacuuming, bagging and disposing of all insulation materials whether they contain asbestos or not from mechanical systems)$46.62$49.30
Insulator/asbestos worker (Includes application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)$46.62$49.30
BOILERMAKER$68.88$49.83
BRICKLAYER BUILDING/RESIDENTIAL CONSTRUCTION Bricklayers, Cement Masons, Plasterers, Stone Masons$47.44$38.00
HEAVY & HIGHWAY CONSTRUCTION Bricklayers, Cement Masons, Plasterers, Stone Masons, Pointers, Caulkers & Cleaners$41.96$33.38
Carpenters : Building and Heavy & Highway Construction$50.12$31.73
Residential$32.60$20.69
MILLWRIGHT$60.83$58.03
Dock Builder & Piledrivermen$60.59$55.84
Diver Tender$55.00$55.84
Diver$75.46$55.84
Pipe Bending Machine Operator$54.63$50.98
ELEVATOR MECHANIC Elevator Constructor$75.14$47.44
b Modernization and Repair$59.09$45.56
ELEVATOR MECHANIC$76.12$38.98
Power equipment operators: GROUP 1$61.72$37.50
GROUP 2$60.13$37.50
GROUP 3$58.22$37.50
GROUP 4$56.59$37.50
GROUP 5$52.88$37.50
GROUP 6$63.54$37.50
Power equipment operators: BUILDING CONSTRUCTION STEEL ERECTION GROUP 1$70.24$37.50
GROUP 2$68.58$37.50
GROUP 3$61.29$37.50
GROUP 4$58.63$37.50
GROUP 5$57.10$37.50
GROUP 6$53.34$37.50
GROUP 7$65.74$37.50
BUILDING CONSTRUCTION TANK ERECTION GROUP 1$69.96$37.50
GROUP 2$68.37$37.50
GROUP 3$64.85$37.50
GROUP 4$61.28$37.50
GROUP 5$54.07$37.50
OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 1$62.35$37.50
GROUP 2$60.70$37.50
GROUP 3$58.56$37.50
GROUP 4$57.06$37.50
GROUP 5$53.34$37.50
GROUP 6$64.28$37.50
RESIDENTIAL CONSTRUCTION ALL JOB CLASSIFICATION$11.49$7.75
IRONWORKER$42.63$53.70
LABORER BUILDING & RESIDENTIAL CONSTRUCTION Hazardous Waste Handler$39.05$21.95
a BUILDING & RESIDENTIAL CONSTRUCTION Air track operators, joy drill operators$37.90$21.95
a All types of landscaping, pit men, dump men, building laborers (clean up), Flag Persons$33.80$21.95
a Blasters$37.05$21.95
pavement breakers, vibrator men, powder men, ramset operators, torchmen, cement spray men, gunite nozzle men, sandblasting, all other machine or semi-skilled and asbestos and hazardous waste removal;$37.05$21.95
a Form setter, liners, joint setters, top concrete men$37.35$21.95
men, steel rod carrriers, rip rap and dry stone layers, concrete laborer, mason tenders, piplayers, (all types), signal men, rail and fence men (all types), core drillers, wrecking and demolition men;$36.81$21.95
a HEAVY & HIGHWAY CONSTRUCTION Hazardous Waste Handler Category A$50.25$28.15
Category B$50.25$28.15
Category C$50.25$28.15
Category D$50.25$28.15
HEAVY & HIGHWAY CONSTRUCTION GROUP 1$52.35$28.15
GROUP 2$50.25$28.15
GROUP 3$46.10$28.15
GROUP 4$42.60$28.15
GLAZIER$49.20$57.20
Painters: Drywall Finisher$39.14$24.66
Lead Abatement Work$39.14$24.66
Painter/Paperhanger$39.14$24.66
Spray Rate$40.14$24.66
PLUMBER PLUMBERS AND STEAMFITTERS$53.20$46.57
REFRIGERATION$41.99$37.38
SINGLE FAMILY DWELLINGS$16.60$4.95
SPRINKLER FITTER$57.20$32.66
Sheet metal worker$55.29$47.43
Truck drivers: GROUP 1$37.91$46.37
a GROUP 1A$39.03$46.37
a GROUP 2$37.35$46.37
a GROUP 3$37.13$46.37
a GROUP 4$37.02$46.37
a GROUP 5$36.90$46.37