Buffalo Creek Boiler Replacement
Combined Synopsis Solicitation from FOREST SERVICE • AGRICULTURE, DEPARTMENT OF. Place of performance: CO. Response deadline: Mar 13, 2026. Industry: NAICS 238220 • PSC J045.
Market snapshot
Awarded-market signal for NAICS 238220 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 238220
Description
Project: Buffalo Creek Boiler Replacement
POC: Erick Plamann, Contract Specialist, erick.plamann@usda.gov
for the replacement of one boiler as outline in attachment 3 Statement of Work (SOW). A- Propane Gas-Fire Boiler - The work shall consist of supplying and installing (1) high efficiency propane gas-fired boiler approved equivalent to the Dunkirk Quantum 90, Q90-200, see attached specifications Attachment 05, at the Buffalo Creek Work Center. Work shall also include the furnishment/installation of any/all plumbing/electrical/expansion tanks/new solenoids/water lines/regulators/miscellaneous components needed for a successful installation. B- Backflow Preventer Replacement – Replace one (1) Caleffi 573012A ½” 573 Backflow Preventer and AutoFill Combination with Pressure Gauge, and one two-way ball valve. C. F- m Water Line Replacement – Replace approximately 5 feet of 1” copper water line, approximately 6 feet of ¾” copper water line, and approximately 3 feet of ½” copper waterline D-Electrical Panel Upgrade – Convert the two (2) outdated electrical panels, located in the entry stairway and attic, respectively, with junction boxes and extend circuits to one (1) new electrical panel. Ensure all new work is appropriately grounded. F-Mold Remediation - Water damage mitigation of the boiler room. Includes temporary removal of plumbing system as necessary, tearing out contaminated plywood and wet insulation, cleaning stud walls, walls, and ceiling, performing detailed HEPA vacuuming, and applying a plant-based antimicrobial agent. F- Boiler Room Interior Reconstruction - The reconstruction phase includes restoring the boiler room and surrounding areas after mitigation.
Magnitude of Construction is between $25,000 and $100,000
Site Visit:
P.O.C. Name: Corey Lewenkamp
Address: 18046 CO RD 126 Pine CO, 80470
Date and Time: February 25, 2026, 1:00 PM Mountain
Telephone: 719-744-7196
P.O.C. Email: corey.lewenkamp@usda.gov
Attachment 1 Solicitation Terms and Conditions
Attachment 2 SOI
Attachment 3 SOW
Attachment 4 BCWC Dwelling Mech & Elec Systems Info
Attachment 5- Product Specs
Attachment 6- Wage Determination
Questions shall be submitted via email to Erick Plamann, Contract Specialist at erick.plmann@usda.gov no later than March 4, 2026, at 12:00 PM Central Time.
Quotes shall be submitted via email to Erick Plamann, Contract Specialist at erick.plmann@usda.gov no later than 12:00 p.m. Central Time on March 13, 2026.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?