Lake Traverse Bil Gate Repairs and Modernization
Special Notice from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: {"streetAddress":"","zip":""}. Response deadline: Feb 04, 2026. Industry: NAICS 237990 • PSC Z2KA.
Market snapshot
Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 237990
Description
Lake Traverse Bil Gate Repairs and Modernization This Is Invitation for Bids (IFB) And Bid Bond Are Required. This Procurement Is Set-Aside 100% For Small Business Concerns Under North American Industry Classification System (NAICS) Code 237990;Other Heavy and Civil Engineering Construction with a Small Business Size Standard of $45m.The Estimated Magnitude of Construction Is Between $1,000,000 And $5,000,000.All bids shall be submitted electronically via the Solicitation Module of PIEE suite. Submissions shall be in Adobe PDF format. Electronic Bid Submissions is required through the Army?s Electronic File Sharing Service in PIEE (https://piee.eb.mil/). The PIEE Application is used to send large files to individuals that would normally be too large to send via email. Information regarding how to set up a vendor registration is included in this link:https://pieetraining.eb.mil/wbt/xhtml/wbt/portal/overview/vendorRegister.xhtml. On this page, click on the Vendor User Registration Doc and it will take you through the process of registering as a vendor.?If you plan on submitting a bid, be sure to select SOL-Solicitation in the drop-down list and choose the Proposal Manager role to be given the proper permissions. ?Further training is available at the following links:?https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml - This link shows information regarding the Solicitation application in PIEE and the different roles available.?https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml - This link is for Bidders regarding the Proposal Manager function and instruction on submitting a bid. Amended 11/21/25 to add updated plan sheet do to questions on Dr. Checks. Amended 11/25/205 to change the due for bid opening. Amended 12/4/2025 to add Specification update and bid due date and bid opening date. Amended 12/8/2026 to extend due date for bid and bid opening Amended 01/08/2026 to extend due date for bids and bid opening. Also update the wage determination. 01/14/2026 Amended to add spec up dates. 01/22/2026 amend to change bid open and due date for bids. 01/27/2026 amended to change bid opening and due date for bids. Also added specification/attachment update and new attachment. 02/04/2026 added bid abstract
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.