P475 Aircraft Maintenance Hangar
Solicitation from DEPT OF THE NAVY • DEPT OF DEFENSE. Place of performance: SC. Response deadline: Feb 19, 2026. Industry: NAICS 236220 • PSC Y1JZ.
Market snapshot
Awarded-market signal for NAICS 236220 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 236220
Description
N40085-26-R-0148 DESIGN-BID-BUILD, P-475 AIRCRAFT MAINTENANCE HANGAR, MCAS BEAUFORT, SOUTH CAROLINAThe proposal due date of 19 February 2026 NLT 2:00 PM EST remains unchanged.The Amendment is issued to incorporate the following:1) Provide Responses to PPIs.2) Provide Revised Drawings: 1363603Amend0006dwg_VOL 3 ARCHITECTURAL 1363603Amend0006dwg_VOL 3 STRUCTURAL_1of2 1363603Amend0006dwg_VOL 3 STRUCTURAL_2of2 CUI_1363603Amend0006dwg_VOL 2A ARCHITECTURAL CUI_1363603Amend0006dwg_VOL 2A STRUCTURAL3) Provide Revised Specifications: 1363603Amendment0006_Specs
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
NAVFAC Mid-Atlantic (Dept. of the Navy) has issued Solicitation N4008526R0148 for a DESIGN-BID-BUILD project titled “P475 Aircraft Maintenance Hangar” at MCAS Beaufort, South Carolina. The proposal due date remains 19 February 2026 (NLT 2:00 PM EST). Amendment 0006 incorporates responses to PPIs and provides revised drawings (Architectural and Structural volumes, including CUI-labeled files) and revised specifications (1363603Amendment0006_Specs). Bidders should immediately reconcile their takeoff/means-and-methods and any prior assumptions to the revised Amendment 0006 drawing/spec set to avoid noncompliant scope or pricing gaps.
Award a design-bid-build construction contract under NAICS 236220 to build the P-475 Aircraft Maintenance Hangar at MCAS Beaufort, using the amended (0006) drawing and specification set and clarifications provided via PPI responses.
- Proposal management and compliance to Solicitation N4008526R0148 and Amendment 0006
- Full scope takeoff and estimating aligned to revised specifications: 1363603Amendment0006_Specs
- Construct per revised drawings: VOL 3 Architectural; VOL 3 Structural (1 of 2 and 2 of 2)
- Construct per revised drawings marked CUI: VOL 2A Architectural and VOL 2A Structural (handle/download/store accordingly)
- Review and incorporate PPI responses into technical approach, inclusions/exclusions, and risk allowances
- Construction execution for an aircraft maintenance hangar facility (trade coordination, phasing, and base access planning—details must be confirmed in the solicitation/attachments)
- Acknowledge/confirm incorporation of Amendment 0006 in the offer (and any other amendments contained in the SAM.gov package)
- Evidence your pricing is based on revised specs: 1363603Amendment0006_Specs
- Evidence your pricing/approach is based on the revised drawing set listed in the notice (VOL 3 Arch/Structural and CUI VOL 2A Arch/Structural)
- A reconciliation narrative identifying key impacts from PPI responses and revised drawings/specs (scope adds/dels, clarifications, RFI assumptions removed)
- Document control plan for handling CUI-labeled attachments during proposal development (internal only; keep minimal but real)
- Any required bid forms, representations, and certifications included in the solicitation package (confirm inside the attachments)
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- The solicitation’s required proposal volumes/forms, evaluation factors, and submission instructions are not provided in the brief; they must be pulled from the SAM.gov attachments/resource files.
- Magnitude/price range, bonding/insurance requirements, and contract type details are not in the brief.
- Period of performance and schedule/phasing requirements are not stated in the brief.
- Place of performance details beyond “MCAS Beaufort, South Carolina” and any base access constraints are not included in the brief.
- Any small business subcontracting plan requirement (since set-aside is NONE) is not indicated in the brief.
- Specific technical scope details (MEP systems, hangar door requirements, fire protection, pavements, utilities) are not described in the brief and require review of the revised specs/drawings.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.