- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
N4008526R0037 P1574/P1591/P1592 MCB CAMP LEJEUNE AND MCAS CHERRY POINT
Solicitation from DEPT OF THE NAVY • DEPT OF DEFENSE. Place of performance: NC. Response deadline: Feb 26, 2026. Industry: NAICS 236220 • PSC Y1JZ.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 236220 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 236220
Description
The work includes the construction of Marine Raider Support Battalion Operational Support facilities and miscellaneous supporting structures, utilities, parking, roadways, pedestrian ways/sidewalks, and site work for Project P1574/P1591/P1592, Marines Corps Base Camp Lejeune, NC
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
This opportunity involves the construction of operational support facilities for the Marine Raider Support Battalion at Marine Corps Base Camp Lejeune, NC, under solicitation N4008526R0037. The work scope includes supporting structures, utilities, parking, roadways, and site work for projects P1574, P1591, and P1592. With a response deadline of February 26, 2026, this solicitation represents a significant project for contractors specializing in construction under the NAICS code 236220.
The buyer intends to select contractors for the construction of Marine Raider Support Battalion facilities at Camp Lejeune, ensuring practical and robust infrastructure support.
- Construction of operational support facilities
- Installation of utilities and parking areas
- Development of roadways and pedestrian pathways
- Site preparation and miscellaneous structures
- Company profile and relevant project history
- Detailed technical approach to the project
- Proposed pricing structure
- Capability statement with team qualifications
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No detailed period of performance specified
- Unclear if bonds are required for contractors
- Lack of information on site conditions
- No contact information for the contracting officer
- Absence of pre-bid meeting details
- Missing cost estimate guidelines
- No detailed requirements on utilities specifications
- No historical performance data on similar projects
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.