Design Build Service Photovoltaic
Design Build Service Photovoltaic
Browse recent opportunities tied to this NAICS code. Open any notice to view details, attachments, and the direct SAM.gov link.
Design Build Service Photovoltaic
Diesel Standby Generator Tooele Air Center
Installation of Electrical Upgrades in Fort Riley BLDG 722, one 300 Amp Panel, 13 Electrical Outlets, 13 Cord Reels. Service and installation to be performed…
SOLICITATION DESCRIPTION: B105 HVAC CONTROL PANEL REPLACEMENT (UPDATED PER AMENDMENTS 0001, 0002, 0003, 0004, AND 0005) AMENDMENT 0005 NOTICE: Proposal Due…
Lowell National Historical Park - Security Upgrades
This is a Sources Sought notice only. This is not a request for quotes and no contract will be awarded from this announcement. The Government will not provide…
This RFQ is for the procurement and installation of the structured cables required for existing VTC systems IAW the Statement of Work. Please read the…
AMENDMENT 03: Amendment to address additional RFIs, and extend solicitation period. (Answers in Bold) Known failure conditions or symptoms for the three (3)…
Site visit is April 2, 2026 at 1000. Please contact john.e.jacobsen16.civ@army.mil if you plan to attend
The magnitude of the proposed construction is between $1,000,000.00 and $5,000,000.00. This acquisition is being issued as a Service Disabled Veteran Owned…
The Mission Installation Contracting Command-Fort Eustis Detachment Rucker has a requirement from the 1-11th Aviation Regiment to provide all personnel and…
Installation of Electrical Upgrades in Fort Riley BLDG 722, one 300 Amp Panel, 13 Electrical Outlets, 13 Cord Reels. Service and installation to be performed…
Contractor shall furnish all labor, materials and equipment necessary to perform all work in connection with Project Number PNQS 25-5418 Repair Electrical…
Login at and search for 'W90VN726RA011' to obtain more details.*
DK - Heart Butte Transformer Pad SOD Please see the attachment entitled "Sol. 140R6026Q0033 3.24.26" for the full solicitation details. Offerors shall bear all…
Installation of Electrical Upgrades in Fort Riley BLDG 722, one 300 Amp Panel, 13 Electrical Outlets, 13 Cord Reels. Service and installation to be performed…
Browse common filters found across the opportunities listed on this page.