Skip to content
SAM WDOL Directory

Wage Determinations

Review SCA, DBA, and CBA wage determinations with location coverage, revisions, rates, and benefit references.

497 records • Page 4 of 21
DBA
167
SCA
37
CBA
293
Active
497
With Rates
203
With Benefits
37
How To Choose
DBA (Construction)
Use for construction, alteration, or repair labor tied to Davis-Bacon prevailing wage requirements.
SCA (Service Contracts)
Use for service contracts where labor categories map to service occupation codes and fringe benefit rules.
CBA (Union Terms)
Use when the solicitation references collective bargaining agreement terms for covered labor classes.
Published Jan 02, 2026
Virginia • Albemarle
POWER EQUIPMENT OPERATOR Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100 ft. above ground
$40.99 + $18.05 fringe
Cranes under 90 tons
$39.99 + $18.05 fringe
IRONWORKER, STRUCTURAL
$21.55 + $1.39 fringe
Published Jan 02, 2026
Virginia • Tazewell
OPERATOR: Crane
$26.68 + $0.00 fringe
OPERATOR: Grader/Blade, Includes Finishing
$26.13 + $0.00 fringe
OPERATOR: Milling Machine
$21.13 + $0.00 fringe
Published Jan 02, 2026
Virginia • Henrico
POWER EQUIPMENT OPERATOR Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100 ft. above ground
$40.99 + $18.05 fringe
Cranes under 90 tons
$39.99 + $18.05 fringe
BRICKLAYER
$22.44 + $10.23 fringe
Published Jan 02, 2026
Virginia • Rockingham
POWER EQUIPMENT OPERATOR Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100 ft. above ground
$40.99 + $18.05 fringe
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)
$40.77 + $20.17 fringe
Cranes under 90 tons
$39.99 + $18.05 fringe
Published Jan 02, 2026
Virginia • Lunenburg
OPERATOR: Crane
$26.68 + $0.00 fringe
OPERATOR: Grader/Blade, Includes Finishing
$26.13 + $0.00 fringe
PAVEMENT MARKING TRUCK DRIVER
$21.40 + $0.00 fringe
Published Jan 02, 2026
Virginia • Henry
OPERATOR: Crane
$26.68 + $0.00 fringe
OPERATOR: Grader/Blade, Includes Finishing
$26.13 + $0.00 fringe
OPERATOR: Milling Machine
$21.13 + $0.00 fringe
Published Jan 02, 2026
Virginia • Amherst, Bedford, Campbell
POWER EQUIPMENT OPERATOR Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100 ft. above ground
$40.99 + $18.05 fringe
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)
$40.77 + $20.17 fringe
Cranes under 90 tons
$39.99 + $18.05 fringe
Published Jan 02, 2026
Virginia • New Kent
ELECTRICIAN, Includes Traffic Signalization
$36.85 + $17.18 fringe
IRONWORKER, STRUCTURAL
$27.38 + $0.00 fringe
OPERATOR: Drill
$24.66 + $0.00 fringe
Published Jan 02, 2026
Virginia • Culpeper
ELECTRICIAN, Includes Traffic Signalization
$36.85 + $17.18 fringe
IRONWORKER, REINFORCING
$34.18 + $0.00 fringe
IRONWORKER, STRUCTURAL
$34.18 + $0.00 fringe
Published Jan 02, 2026
Virginia • Caroline
ELEVATOR MECHANIC
$51.39 + $38.43 fringe
POWER EQUIPMENT OPERATOR Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100 ft. above ground
$40.99 + $18.05 fringe
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)
$40.77 + $20.17 fringe
Published Jan 02, 2026
Virginia • Nelson
ELECTRICIAN, Includes Traffic Signalization
$36.85 + $17.18 fringe
IRONWORKER, STRUCTURAL
$27.38 + $0.00 fringe
OPERATOR: Grader/Blade
$26.13 + $0.00 fringe
Published Jan 02, 2026
Virginia • Gloucester, Isle of Wight, Mathews +1
ELEVATOR MECHANIC
$52.06 + $38.43 fringe
POWER EQUIPMENT OPERATOR Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100 ft. above ground
$40.99 + $18.05 fringe
Cranes under 90 tons
$39.99 + $18.05 fringe
Published Jan 02, 2026
Virginia • Prince William
ELECTRICIAN, Includes Traffic Signalization
$36.85 + $17.18 fringe
IRONWORKER, REINFORCING
$34.18 + $0.00 fringe
IRONWORKER, STRUCTURAL
$34.18 + $0.00 fringe
Published Jan 02, 2026
Virginia • Floyd, Giles, Montgomery +1
POWER EQUIPMENT OPERATOR Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100 ft. above ground
$40.99 + $18.05 fringe
Cranes under 90 tons
$39.99 + $18.05 fringe
IRONWORKER, STRUCTURAL
$21.55 + $1.39 fringe
Published Jan 02, 2026
Virginia • Fauquier
ELECTRICIAN, Includes Traffic Signalization
$36.85 + $17.18 fringe
IRONWORKER, REINFORCING
$34.18 + $0.00 fringe
IRONWORKER, STRUCTURAL
$34.18 + $0.00 fringe
Published Jan 02, 2026
Virginia • Fairfax
POWER EQUIPMENT OPERATOR Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100 ft. above ground
$40.99 + $18.05 fringe
Cranes under 90 tons
$39.99 + $18.05 fringe
WATERPROOFER
$22.50 + $1.05 fringe
Published Jan 02, 2026
Virginia • Campbell
ELECTRICIAN, Includes Traffic Signalization
$36.85 + $17.18 fringe
IRONWORKER, STRUCTURAL
$27.38 + $0.00 fringe
OPERATOR: Grader/Blade
$26.13 + $0.00 fringe
Published Jan 02, 2026
Virginia • Bland, Buchanan, Carroll +8
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)
$40.77 + $20.17 fringe
POWER EQUIPMENT OPERATOR Bulldozer
$38.79 + $18.05 fringe
ELECTRICIAN
$37.95 + $25.95 fringe
Published Jan 02, 2026
Virginia • Warren
ELECTRICIAN, Includes Traffic Signalization
$36.85 + $17.18 fringe
IRONWORKER, REINFORCING
$34.18 + $0.00 fringe
IRONWORKER, STRUCTURAL
$34.18 + $0.00 fringe
Published Jan 02, 2026
Virginia • Louisa
Excavator
$39.99 + $18.05 fringe
Power equipment operators: Bulldozer
$38.79 + $18.05 fringe
Mechanic
$26.78 + $6.32 fringe
Published Jan 02, 2026
Virginia • Bland, Buchanan, Carroll +9
PLUMBER
$19.84 + $3.38 fringe
OPERATOR: Loader
$18.75 + $0.00 fringe
ELECTRICIAN
$15.75 + $0.00 fringe
Published Jan 02, 2026
Virginia • Cumberland
Excavator
$39.99 + $18.05 fringe
Power equipment operators: Bulldozer
$38.79 + $18.05 fringe
Mechanic
$26.78 + $6.32 fringe
Not affiliated with the U.S. Government. Verify final wage determination applicability and full text on SAM.gov.