Skip to content
Davis-Bacon

VA20260152 (Rev 0)

Coverage: Virginia • Floyd, Giles, Montgomery +1.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
POWER EQUIPMENT OPERATOR Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100 ft. above ground$40.99$18.05
Cranes under 90 tons$39.99$18.05
BRICKLAYER$16.35$0.00
CARPENTER$12.60$0.00
CEMENT MASON/CONCRETE FINISHER$16.84$0.00
ELECTRICIAN$16.34$0.00
IRONWORKER, ORNAMENTAL$15.59$0.00
IRONWORKER, STRUCTURAL$21.55$1.39
LABORER: Common or General$12.79$1.30
LABORER: Mason Tender - Brick$12.37$0.00
LABORER: Mason Tender - Cement/Concrete$12.37$0.00
LABORER: Pipelayer$14.88$1.51
OPERATOR: Backhoe/Excavator/Trackhoe$17.36$2.25
OPERATOR: Bobcat/Skid Steer/Skid Loader$15.26$0.80
OPERATOR: Bulldozer$15.29$2.27
OPERATOR: Loader$17.93$2.70
PAINTER (Brush and Roller)$15.41$0.00
PLUMBER$16.14$1.50
ROOFER$15.33$1.95
SHEET METAL WORKER, Includes HVAC Duct Installation$15.54$0.00
TRUCK DRIVER: Dump Truck$16.30$0.00

Related Wage Determinations

View directory →