Skip to content
Davis-Bacon

VA20260139 (Rev 0)

Coverage: Virginia • Henrico.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
BRICKLAYER$22.44$10.23
POWER EQUIPMENT OPERATOR Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100 ft. above ground$40.99$18.05
Cranes under 90 tons$39.99$18.05
CARPENTER$17.99$0.00
CEMENT MASON/CONCRETE FINISHER$15.05$0.00
DRYWALL HANGER AND METAL STUD INSTALLER$15.32$0.00
ELECTRICIAN$16.18$0.00
IRONWORKER, ORNAMENTAL$15.59$0.00
IRONWORKER, STRUCTURAL$21.55$1.39
LABORER: Common or General$10.43$0.00
LABORER: Mason Tender - Brick$13.56$0.00
LABORER: Mason Tender - Cement/Concrete$12.84$0.00
LABORER: Pipelayer$14.70$1.71
OPERATOR: Backhoe/Excavator/Trackhoe$18.58$1.98
OPERATOR: Bobcat/Skid Steer/Skid Loader$15.26$0.80
OPERATOR: Bulldozer$14.91$2.27
OPERATOR: Loader$15.21$2.77
PAINTER (Brush and Roller)$13.02$0.00
PLUMBER$16.71$0.76
ROOFER$13.15$0.00
SHEET METAL WORKER, Includes HVAC Duct Installation$15.77$0.00
TRUCK DRIVER: Dump Truck$16.30$0.00

Related Wage Determinations

View directory →