Davis-Bacon
WA20260109 (Rev 0)
Coverage: Washington • Kitsap.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems) | $75.37 | $18.82 |
| TILE FINISHER | $40.98 | $18.17 |
| TILE SETTER | $49.70 | $18.62 |
| BRICKLAYER | $55.34 | $20.05 |
| CARPENTER (Includes Drywall Hanger) | $63.98 | $19.13 |
| ELECTRICIAN | $75.96 | $33.48 |
| OPERATOR: Blade Finish | $60.14 | $27.57 |
| OPERATOR: Bulldozer D9 & under | $59.49 | $27.57 |
| OPERATOR: Grader/Blade | $60.93 | $27.57 |
| OPERATOR: Paver (Asphalt, Aggregate, and Concrete) | $60.93 | $27.57 |
| OPERATOR: Backhoe/Excavator/Trackhoe 15 to 30 metric tons | $60.14 | $27.57 |
| Over 30 metric tons and up to 50 metric tons | $60.93 | $27.57 |
| Under 15 metric tons | $59.49 | $27.57 |
| OPERATOR: Concrete Pump Truck mount with boom attachment over 42M | $60.93 | $27.57 |
| OPERATOR: Crane 100 tons through 199 tons, or 150' of boom (including jib with attachments) | $61.83 | $27.57 |
| tons through 44 tons with attachments; Truck Crane Oiler/Driver: 100 tons | $60.14 | $27.57 |
| tons through 99 tons, under 150' of boom (including jib with attachments) | $60.93 | $27.57 |
| OPERATOR: Loader Overhead 6 yards but not including 8 yards | $60.93 | $27.57 |
| Overhead under 6 yards | $60.14 | $27.57 |
| OPERATOR: Oiler Drill Oilers: auger type, truck or crane mount; Truck Crane Oiler/Driver: under 100 tons | $60.14 | $27.57 |
| Truck Crane Oiler/Driver: 100 tons and over | $59.49 | $27.57 |
| OPERATOR: Roller Other than plant mix | $55.68 | $27.57 |
| Plant mix or multi-lift materials | $59.49 | $27.57 |
| IRONWORKER | $57.94 | $34.52 |
| LABORER: Form Stripping | $50.38 | $16.96 |
| LABORER: Grade Checker | $52.31 | $17.01 |
| LABORER: Jackhammer | $51.52 | $16.99 |
| LABORER: Mason Tender - Cement/Concrete | $50.38 | $16.96 |
| LABORER: Nozzle Person | $52.31 | $17.01 |
| LABORER: Concrete Saw Chain | $51.52 | $16.99 |
| Laborer, Mason Tender Brick | $50.38 | $16.96 |
| LABORER: Fire Watch | $40.56 | $15.60 |
| PAINTER | $41.24 | $14.70 |
| DRYWALL FINISHER/TAPER | $53.59 | $23.65 |
| CEMENT MASON/CONCRETE FINISHER | $54.16 | $21.27 |
| PLASTERER | $52.50 | $20.67 |
| PIPEFITTER | $60.72 | $34.15 |
| PLUMBER | $60.72 | $34.15 |
| ROOFER | $48.01 | $16.44 |
| SPRINKLER FITTER | $68.89 | $33.80 |
| SHEET METAL WORKER | $69.86 | $33.39 |
| TRUCK DRIVER: Concrete Truck | $55.43 | $27.52 |
| OPERATOR: Drill | $56.42 | $21.15 |
| LABORER: Asbestos Abatement (Removal from Floors, Walls, & Ceilings) | $35.54 | $10.89 |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor | $42.25 | $0.00 |
| LABORER: Common or General | $36.24 | $10.89 |
| LABORER: Pipelayer | $35.83 | $10.89 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $40.53 | $9.56 |
| OPERATOR: Mechanic | $45.17 | $19.20 |
| TRUCK DRIVER: Dump Truck | $45.47 | $7.05 |