Davis-Bacon
WA20260108 (Rev 0)
Coverage: Washington • King.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| HEAT & FROST INSULATOR (Includes Duct, Pipe and Mechanical Systems) | $75.37 | $18.82 |
| TILE FINISHER | $40.98 | $18.17 |
| TILE SETTER | $49.70 | $18.62 |
| BRICKLAYER | $55.34 | $20.05 |
| MARBLE FINISHER | $40.98 | $18.17 |
| MARBLE SETTER | $49.70 | $18.62 |
| MASON - STONE | $55.34 | $20.05 |
| TERRAZZO FINISHER | $40.98 | $18.17 |
| TERRAZZO WORKER/SETTER | $51.70 | $18.62 |
| MILLWRIGHT | $55.39 | $22.38 |
| Carpenter (Includes Acoustical Ceiling Mechanic & Dry Hanger) | $63.98 | $19.13 |
| ELECTRICIAN | $75.96 | $33.48 |
| OPERATOR: Backhoe/Excavator/Trackhoe 15 to 30 metric tons | $61.14 | $27.57 |
| Over 30 metric tons and up to 50 metric tons | $61.93 | $27.57 |
| Under 15 metric tons | $60.46 | $27.57 |
| OPERATOR: Concrete Pump Truck mount with boom attachment over 42M | $61.93 | $27.57 |
| OPERATOR: Crane 100 tons through 199 tons, or 150' of boom (including jib with attachments) | $62.85 | $27.75 |
| tons through 44 tons with attachments; Truck Crane Oiler/Driver: 100 tons | $61.14 | $27.75 |
| tons through 99 tons, under 150' of boom (including jib with attachments) | $61.93 | $27.75 |
| OPERATOR: Loader Overhead 6 yards but not including 8 yards | $61.14 | $27.57 |
| OPERATOR: Oiler Drill Oilers: auger type, truck or crane mount; Truck Crane Oiler/Driver: under 100 tons | $61.14 | $27.57 |
| Truck Crane Oiler/Driver: 100 tons and over | $60.46 | $27.57 |
| OPERATOR: Roller Other than plant mix | $56.63 | $27.57 |
| Plant mix or multi-lift materials | $60.46 | $27.57 |
| OPERATOR: Screed | $61.14 | $25.57 |
| OPERATOR: Blade Finish | $61.14 | $27.57 |
| OPERATOR: Bulldozer D9 & under | $60.46 | $27.57 |
| OPERATOR: Grader/Blade | $61.93 | $27.57 |
| OPERATOR: Paver (Asphalt, Aggregate, and Concrete) | $61.93 | $27.57 |
| IRONWORKER | $57.94 | $34.52 |
| LABORER: Asbestos Abatement (Removal from Floors, Walls, & Ceilings) | $50.38 | $16.96 |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor | $52.31 | $17.01 |
| LABORER: Common or General | $50.38 | $16.96 |
| LABORER: Concrete Saw Chain | $51.52 | $16.99 |
| LABORER: Form Stripping | $50.38 | $16.96 |
| LABORER: Hod Carrier | $52.31 | $17.01 |
| LABORER: Grade Checker | $52.31 | $17.01 |
| LABORER: Jackhammer | $51.52 | $16.99 |
| LABORER: Mason Tender - Cement/Concrete | $50.38 | $16.96 |
| LABORER: Nozzle Person | $52.31 | $17.01 |
| SCAFFOLD BUILDER | $50.38 | $16.96 |
| TRAFFIC CONTROL: Flagger | $40.88 | $16.72 |
| Laborer, Mason Tender Brick | $50.38 | $16.96 |
| LABORER: Fire Watch | $40.56 | $15.60 |
| GLAZIER | $61.14 | $23.76 |
| PAINTER | $41.24 | $14.70 |
| DRYWALL FINISHER/TAPER | $53.59 | $23.65 |
| FLOOR LAYER: SOFT FLOORS | $42.01 | $20.20 |
| CEMENT MASON/CONCRETE FINISHER | $54.16 | $21.27 |
| PLASTERER | $52.50 | $20.67 |
| PIPEFITTER | $75.21 | $33.88 |
| PLUMBER | $75.21 | $33.88 |
| ROOFER | $48.01 | $16.44 |
| SPRINKLER FITTER | $68.89 | $33.80 |
| SHEET METAL WORKER | $69.86 | $33.39 |
| TRUCK DRIVER: Concrete Truck | $55.43 | $27.52 |
| TRUCK DRIVER: Dump Truck 16 to 30 yard capacity | $55.43 | $27.52 |
| Less than 16 yard capacity | $54.59 | $27.52 |
| TRUCK DRIVER: Pickup Truck | $51.78 | $27.52 |
| OPERATOR: Drill | $56.42 | $21.15 |
| LABORER: Pipelayer | $45.61 | $14.40 |
| LABORER: Landscape | $18.41 | $3.20 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader | $40.53 | $9.56 |
| OPERATOR: Mechanic | $42.85 | $19.20 |