Skip to content
Davis-Bacon

WA20260036 (Rev 0)

Coverage: Washington • Pacific.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
ASBESTOS WORKER/HEAT & FROST INSULATOR (Pipe Insulation)$75.37$18.82
BRICKLAYER (NORTHERN PART)$55.34$20.05
BRICKLAYER (SOUTHERN PART)$49.60$25.18
TILE SETTER NORTHERN PORTION OF COUNTY$49.70$18.62
SOUTHERN PORTION OF COUNTY$43.93$21.81
CARPENTER (Including Formwork and Drywall Hanging)$54.69$16.81
CARPENTER (Including Formwork and Drywall Hanging)$63.98$19.13
ELECTRICIAN$65.14$26.56
POWER EQUIPMENT OPERATOR GROUP 1A$61.22$27.32
GROUP 1AA$62.12$27.32
GROUP 1AAA$62.99$27.32
GROUP 1$60.32$27.32
GROUP 2$59.56$27.32
GROUP 3$58.89$27.32
GROUP 4$55.13$27.32
POWER EQUIPMENT OPERATOR GROUP 1$58.94$17.15
GROUP 1A$61.10$17.15
GROUP 1B$63.26$17.15
GROUP 2$57.03$17.15
GROUP 3$55.88$17.15
GROUP 4$52.55$17.15
GROUP 5$51.31$17.15
GROUP 6$48.09$17.15
Ironworker (REINFORCING, STRUCTURAL AND ORNAMENTAL)$57.94$34.52
Laborers: GROUP 3$50.38$16.96
GROUP 4$51.52$16.99
GROUP 5$52.31$17.01
Laborers: GROUP 3$44.06$15.60
GROUP 4$44.90$15.60
GROUP 6$45.54$15.60
Painters: (Brush and Roller, Excludes Spray)$40.85$16.68
SOFT FLOOR LAYER (Including Vinyl and Carpet)$41.77$21.18
CEMENT MASON/CONCRETE FINISHER$54.16$21.27
PIPEFITTER$60.72$34.15
ROOFER (Includes Roof Tear Off, Waterproofing, and Installation of Metal Roofs)$47.98$16.47
SHEET METAL WORKER, Includes HVAC Duct Installation$69.86$33.39
OPERATOR: Bobcat/Skid Steer/Skid Loader$27.94$0.00
PAINTER: Spray$17.80$4.18
PLUMBER$35.00$0.00
TRUCK DRIVER$23.50$6.87

Related Wage Determinations

View directory →