Skip to content
Davis-Bacon

OK20260043 (Rev 0)

Coverage: Oklahoma • Comanche.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
BRICKLAYER$26.92$13.09
ELECTRICIAN (Excludes Low Voltage Wiring)$41.40$17.25
POWER EQUIPMENT OPERATOR: Group 1$38.09$19.05
Group 2$36.14$19.05
Group 3$35.40$19.05
Group 4$34.07$19.05
Group 8$28.77$19.05
Group10$27.25$19.05
IRONWORKER (Ornamental and Structural)$32.10$17.38
PLUMBER (Excludes HVAC Pipe Installation)$41.00$16.03
PIPEFITTER (Including HVAC Pipe Installation)$41.00$16.03
ROOFER$26.30$10.34
SHEET METAL WORKER (HVAC Duct Installation Only)$33.38$16.36
CARPENTER (Drywall Hanging Only)$15.50$2.80
CARPENTER, Excludes Drywall Hanging$15.50$2.80
CEMENT MASON/CONCRETE FINISHER$16.72$0.00
DRYWALL FINISHER/TAPER$13.80$0.00
ELECTRICIAN (Low Voltage Wiring)$20.08$5.43
IRONWORKER, REINFORCING$17.11$0.00
LABORER: Common or General$9.31$0.00
LABORER: Mason Tender - Brick$12.00$0.00
LABORER: Mason Tender - Cement/Concrete$13.00$1.91
LABORER: Pipelayer$12.39$0.00
OPERATOR: Backhoe/Excavator/Trackhoe$21.25$4.35
OPERATOR: Bulldozer$20.64$2.35
OPERATOR: Grader/Blade$14.28$1.70
OPERATOR: Loader (Front End)$16.18$0.00
PAINTER: Brush, Roller and Spray, Excludes Drywall Finishing/Taping$12.91$0.00
SHEET METAL WORKER, Excludes HVAC Duct Installation$21.82$0.00
TRUCK DRIVER: Dump and Flatbed Truck$11.60$0.00

Related Wage Determinations

View directory →