Davis-Bacon
OK20260014 (Rev 0)
Coverage: Oklahoma • Comanche.
Published: Jan 02, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| Traffic signal installer | $17.37 | $0.00 |
| Includes Form Work) | $12.22 | $0.00 |
| IRONWORKER, REINFORCING | $12.67 | $0.00 |
| STRUCTURAL | $14.21 | $0.00 |
| Common or General | $10.12 | $0.00 |
| Pipelayer | $12.50 | $0.00 |
| Traffic Control (Includes Flagger, Setting Up and Moving Cones/Barrels) | $11.05 | $0.00 |
| Asphalt Paver Screed | $12.53 | $0.00 |
| Backhoe/Trackhoe | $13.64 | $0.00 |
| Broom | $11.97 | $0.00 |
| Concrete Paving Machine | $13.61 | $0.00 |
| Crane | $17.12 | $0.00 |
| Excavator | $14.94 | $0.00 |
| Loader (Front End) | $12.90 | $0.00 |
| Milling Machine | $14.56 | $0.00 |
| Oiler | $13.65 | $0.00 |
| Asphalt) | $12.73 | $0.00 |
| Dirt Compaction) | $12.01 | $0.00 |
| Striping Machine | $12.56 | $0.00 |
| Trencher | $13.63 | $0.00 |
| Flatbed Truck | $14.69 | $0.00 |
| Off the Road Truck | $12.86 | $0.00 |
| Tandem Axle/Semi Trailer | $13.72 | $0.00 |