Skip to content
Davis-Bacon

NY20260117 (Rev 0)

Coverage: New York • Steuben.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
TILE SETTER$38.34$20.51
CEMENT MASON/CONCRETE FINISHER$32.53$22.10
SOFT FLOOR LAYER$25.61$17.40
CARPENTER (Excludes Acoustical Ceiling Installation, Drywall Hanging, Form Work and Metal Stud Installation)$31.59$23.24
ELECTRICIAN (Includes Low Voltage Wiring)$42.50$27.23
IRONWORKER, ORNAMENTAL$35.49$32.30
IRONWORKER, REINFORCING$35.49$32.30
IRONWORKER, STRUCTURAL$35.49$32.30
PAINTER (Spray)$28.35$25.21
PAINTER (Brush and Roller)$27.25$25.24
PLUMBER$42.20$29.80
PIPEFITTER$37.47$27.40
ROOFER$36.70$18.00
BRICKLAYER$31.61$24.98
CARPENTER (Acoustical Ceiling Installation Only)$26.00$18.35
CARPENTER (Drywall Hanging Only)$26.99$17.40
CARPENTER (Form Work Only)$25.84$17.56
GLAZIER$25.03$19.70
HVAC MECHANIC: HVAC PIPE INSTALLATION$31.30$23.84
INSTALLER: METAL STUDS$26.70$17.40
INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)$29.01$21.31
LABORER: Common or General$24.35$16.27
LABORER: Mason Tender - Cement/Concrete$23.84$14.18
MILLWRIGHT$27.08$19.72
OPERATOR: Backhoe/Excavator/Trackhoe$43.97$24.17
OPERATOR: Bobcat/Skid Steer/Skid Loader$41.10$19.26
OPERATOR: Crane$36.52$26.91
OPERATOR: Forklift$32.70$24.12
PAINTER: Drywall Finishing/Taping$24.81$21.13

Related Wage Determinations

View directory →