Skip to content
Davis-Bacon

NY20260046 (Rev 1)

Coverage: New York • Hamilton.

Published: Jan 30, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
Asbestos Workers/Insulator Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechnical systems$41.74$27.58
HANDLER Duties limited to preparation wetting; stripping; removal; scrapping; vacuuming; bagging; and disposing of all insulation materials, whether they contain asbestos or not from mechanical systems$41.74$27.58
BOILERMAKER$43.34$27.66
Bricklayer, Caulker, Cleaner, Pointer, Stonemason & Cement Mason$33.82$19.95
Cement Mason/Concrete Finisher HEAVY & HIGHWAY$37.23$19.51
Marble, Tile & Terrazzo Finisher$25.59$16.34
Marble, Tile Layer & Terrazzo Worker$32.59$19.05
CARPENTER HEAVY AND HIGHWAY CONSTRUCTION$41.03$24.50
ELECTRICIAN$48.00$32.09
Power equipment operators: GROUP A(1)$55.42$33.20
GROUP A$54.93$33.20
GROUP B$53.91$33.20
GROUP C$51.01$33.20
Power equipment operators: GROUP 1$57.30$33.55
GROUP 2$56.39$33.55
GROUP 3$53.82$33.55
GROUP 4$63.30$33.55
GROUP 5$61.80$33.55
GROUP 6$60.30$33.55
GROUP 7$58.91$33.55
Ironworkers: Sheeter, Bucker-up$38.75$25.48
Sheeter$38.75$25.48
Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcing, Stone Derrickmen$38.50$25.48
IRONWORKER Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcement, and Stone Derrickman$35.50$31.39
Hazardous waste removal includes, wetting,stripping, removal, scrapping, vaccuuming, bagging and disposing of all insulation materials, wheather they contain asbestos or not, from mechanical systems)$24.00$20.64
a Asbestos Removal$24.00$20.64
a Blasters, Form Setters, Motor Buggy Operator (Rider Type)$23.00$20.64
a Laborers$22.50$20.64
a Pipelayers, Motor Mixers, Motor Buggy Operator (Walk Behind) Power Lift (Walk Behind)$22.65$20.64
a Wagon Drill Operator$22.90$20.64
a HEAVY & HIGHWAY CONSTRUCTION: GROUP 1$28.05$23.74
a GROUP 2$28.25$23.74
a GROUP 3$28.45$23.74
a GROUP 4$28.65$23.74
a GROUP 5$24.00$20.64
GLAZIER$37.25$33.54
Painters: Lead Abatement Workers, Structural Steel$34.50$21.69
Painters, Drywall Finishers, Spray$33.50$21.69
Plumber and Steamfitter$55.26$29.12
PLUMBER Northern Zone$45.93$33.77
Plumber and Steamfitter$45.88$33.60
ROOFER$38.05$24.27
SPRINKLER FITTER$47.85$28.94
Sheet metal worker$33.73$33.04
Truck drivers: GROUP 1$35.48$31.58
a GROUP 2$35.83$31.58

Related Wage Determinations

View directory →