Skip to content
Davis-Bacon

NY20260021 (Rev 0)

Coverage: New York • Delaware.

Published: Jan 02, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
Asbestos Workers/Insulator Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechnical systems$41.74$27.58
HANDLER Duties limited to preparation wetting; stripping; removal; scrapping; vacuuming; bagging; and disposing of all insulation materials, whether they contain asbestos or not from mechanical systems$41.74$27.58
BOILERMAKER$43.34$27.66
CEMENT MASON$38.63$25.05
CARPENTER$39.52$27.16
CABLE SPLICER$50.43$33.29
ELECTRICIAN$42.68$33.06
Power equipment operators: GROUP 1$61.72$37.50
GROUP 2$60.13$37.50
GROUP 3$58.22$37.50
GROUP 4$56.59$37.50
GROUP 5$52.88$37.50
GROUP 6$63.54$37.50
Power equipment operators: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 1$62.35$37.50
GROUP 2$60.70$37.50
GROUP 3$58.56$37.50
GROUP 4$57.10$37.50
GROUP 5$53.34$37.50
GROUP 6$64.28$37.50
STEEL ERECTION GROUP 1$70.24$37.50
GROUP 2$68.58$37.50
GROUP 3$61.29$37.50
GROUP 4$58.63$37.50
GROUP 5$57.10$37.50
GROUP 6$53.34$37.50
GROUP 7$65.74$37.50
TANK ERECTION GROUP 1$69.96$37.50
GROUP 2$68.37$37.50
GROUP 3$64.85$37.50
GROUP 4$61.28$37.50
GROUP 5$54.07$37.50
Ironworkers: Sheeter$38.75$25.48
Structural, Ornamental, Rodman, Machinery Mover, Rigger, Fence Erector, Reinforcing, Stone Derrickmen$38.50$25.48
Laborers: HEAVY & HIGHWAY: GROUP 1$40.80$32.45
a GROUP 2$44.80$32.45
a GROUP 3$49.40$32.45
a GROUP 4$54.70$32.45
a TUNNEL, SHAFT & CASSION WORK GROUP 1$48.05$29.50
Laborers: HEAVY AND HIGHWAY GROUP 1$35.56$25.60
a GROUP 2$35.76$25.60
a GROUP 3$35.96$25.60
a GROUP 4$36.16$25.60
a GROUP 5$38.76$25.60
Painters: Bridges$42.06$30.59
Epoxy-Brush & Roller$27.00$18.58
Painters and Tapers$25.90$18.58
Spray Epoxy$27.40$18.58
Spray Work/Steeple Jack (over 100 ft)$26.90$18.58
Structural Scaffold (Over 39 ft)$26.50$18.58
Structural Steel (buildings) Spray Work$26.50$18.58
Toothpick Staging (Over 25 ft)$26.50$18.58
GLAZIER$30.00$31.95
PLUMBER$60.66$45.35
Plumber and Steamfitter Southern Zone$42.63$32.24
ROOFER$30.50$19.84
Sheet metal worker$35.94$20.89
Truck drivers: GROUP 1$37.27$29.29
a GROUP 2$37.27$29.29
a GROUP 3$37.27$29.29
a GROUP 4$37.47$29.29
a GROUP 5$37.47$29.29

Related Wage Determinations

View directory →