Davis-Bacon
IN20260001 (Rev 3)
Coverage: Indiana • La Porte, Lake, Porter +1.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (LAKE AND PORTER COUNTIES) | $56.02 | $37.24 |
| PREPARATION, WETTING, STRIPPING REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (LAKE AND PORTER COUNTIES) | $44.82 | $34.00 |
| DES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUMING, BAGGING, AND DISPOSAL OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (REMAINING COUNTIES) | $41.20 | $30.93 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR (REMAINING COUNTIES) | $41.20 | $30.93 |
| BOILERMAKER (LAKE COUNTY, CITY OF HAMMOND; NORTH OF 114TH STREET) | $58.91 | $39.75 |
| BOILERMAKER | $43.24 | $38.17 |
| BRICKLAYER: TERRAZZO FINISHER (LAKE, LAPORTE AND PORTER COUNTIES) | $33.00 | $21.84 |
| BRICKLAYER: MARBLE FINISHER; TILE FINISHER (LAKE, LAPORTE AND PORTER COUNTIES) | $34.00 | $21.84 |
| BRICKLAYER: TERRAZZO FINISHER (SOUTH BEND: ST. JOSEPH COUNTY) | $33.00 | $21.84 |
| BRICKLAYER: MARBLE AND TILE FINISHER (SOUTH BEND: ST. JOSEPH COUNTY) | $33.00 | $21.84 |
| CARPENTER (ST. JOSEPH COUNTY) | $34.70 | $25.98 |
| MILLWRIGHT (LAKE, LAPORTE AND PORTER COUNTIES) | $47.92 | $37.23 |
| CARPENTER (LAKE, LAPORTE AND PORTER COUNTIES) | $45.91 | $35.90 |
| Fringes MILLWRIGHT (ADAMS, ALLEN, CASS, DEKALB, ELKHART, FULTON, GRANT, HOWARD, HUNTINGTON, KOSCIUSKO, LAGRANGE, MARSHALL, MIAMI, NOBLE, ST. JOSEPH, STEUBEN, TIPTON, WABASH, WELLS AND WHITLEY COUNTIES) | $35.89 | $30.52 |
| H INSTALLATION OR SERVICE. THE SCOPE OF WORK SHALL EXCLUDE THE INSTALLATION OF ELECTRICAL POWER WIRING AND THE INSTALLATION OF CONDUIT RACEWAYS EXCEEDING FIFTEEN (15) FEET IN LENGTH. (ST JOSEPH COUNTY) | $26.50 | $18.33 |
| H INSTALLATION OR SERVICE. THE SCOPE OF WORK SHALL EXCLUDE THE INSTALLATION OF ELECTRICAL POWER WIRING AND THE INSTALLATION OF CONDUIT RACEWAYS EXCEEDING FIFTEEN (15) FEET IN LENGTH. (ST JOSEPH COUNTY) | $46.00 | $29.23 |
| ELECTRICIAN (LAPORTE AND PORTER COUNTIES) | $49.00 | $32.89 |
| ELECTRICIAN (LAKE COUNTY) | $52.00 | $32.85 |
| OT COVER ANY WORK WHICH PROPERLY COMES UNDER THE WORK DESCRIPTION OF INSIDE JW (JOURNEYMAN WIREMAN), BUT SHALL COVER THE PULLING OF WIRE IN RACEWAYS, BUT NOT THE INSTALLATION OF RACEWAYS. (LAKE COUNTY) | $41.50 | $31.23 |
| LINE CONSTRUCTION:: LINEMAN (LAKE & PORTER COUNTIES (CALUMET AREA, NORTH OF U.S. HWY 30)) | $50.28 | $22.16 |
| LINE CONSTRUCTION:: GROUNDMAN-TRUCK DRIVER (LAKE & PORTER COUNTIES (CALUMET AREA, NORTH OF U.S. HWY 30)) | $31.49 | $16.71 |
| LINE CONSTRUCTION:: GROUNDMAN (LAKE & PORTER COUNTIES (CALUMET AREA, NORTH OF U.S. HWY 30)) | $31.49 | $16.71 |
| OF J.L. RATE (LAKE & PORTER COUNTIES (CALUMET AREA, NORTH OF U.S. HWY 30)) | $47.35 | $21.53 |
| ON:: EQUIPMENT OPERATOR 1: (DIGGERS 5TH WHEEL TYPE TRUCKS, CRAWLER TYPE, D-4 AND SMALLER, BUCKET TRUCKS AND LIVE BOOM TYPE LINE TRUCKS) (LAKE & PORTER COUNTIES (CALUMET AREA, NORTH OF U.S. HWY 30)) | $38.33 | $18.92 |
| OF REGULAR HOURLY RATE FOR LESS THAN 5 YEARS OF SERVICE | $70.68 | $38.44 |
| FOR LESS THAN 5 YEARS' SERVICE | $62.27 | $38.44 |
| POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 5 FORK LIFTS (HOUSING AND COMMERCIAL ONLY) (LAKE, LAPORTE, AND PORTER COUNTIES) | $35.95 | $45.93 |
| POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 4 BULL GANG (CRANE ERECTION CREW); HEATERS, MECHANICAL (1 TO 5); OILERS; SWITCHMEN (LAKE, LAPORTE, AND PORTER COUNTIES) | $41.40 | $45.93 |
| TO EXCEED A TOTAL OF 300 FEET); PUMPS, WELL POINTS; STEAM GENERATORS; TRACTORS, FARM & SIMILAR TYPE; WELDING MACHINES (2 THRU 5); WINCHES, 4 ELECTRIC DRILLO WINCHES (LAKE, LAPORTE, AND PORTER COUNTIES) | $43.60 | $45.93 |
| AUTOMATIC), HOIST (ALL ELEVATORS); HOIST (TUGGER AND SINGLE DRUM); POST HOLE DIGGER; ROLLERS (ALL); SCOOP (TRACTOR DRAWN); STONE CRUSHERS; TOURNAPULL; WINCH TRUCKS (LAKE, LAPORTE, AND PORTER COUNTIES) | $47.90 | $45.93 |
| PROPELLED), ROCK DRILL TRUCK MOUNTED; SLIP FORM PAVER, STRADDLE BUGGIES, TRACTOR WITH BOOM AND SIDE BOOM, TRENCHING MECHINE; WINCH TRACTORS, WELDING MACHINES (6-9), (LAKE, LAPORTE, AND PORTER COUNTIES) | $48.70 | $45.93 |
| POWER EQUIPMENT OPERATOR, BUILDING CONSTRUCTION GROUP 5 BOBCATS AND FORKLIFTS (COMMERCIAL OR RESIDENTIAL). (ST. JOSEPH COUNTY) | $30.60 | $38.65 |
| UGGER SINGLE DRUM), OILERS, PUMPS, WELL POINTS AND ELECTRIC SUBMERSIBLE, SMALL RUBBER TIRED END LOADERS (1/4 CU. YD. AND UNDER), TRACTORS (FARM TYPE) WELDING MACHINES (2 THROUGH 8). (ST. JOSEPH COUNTY) | $33.20 | $38.65 |
| ELEVATORS (MATERIAL AND PERSONNEL), HYDRAULIC POWER UNITS, GROUTING AND PILE DRIVING, STUD WELDER, TRENCHING MACHINES LESS THAN 12 INCHES IN WIDTH, WELDING MACHINES (8 THROUGH 15). (ST. JOSEPH COUNTY) | $34.00 | $38.65 |
| FRAME. (ST. JOSEPH COUNTY) | $34.80 | $38.65 |
| R, TOURNAPULL, TRACTOR WITH BOOM & SIDE BOOM, TRENCHING MACHINE (12 OR MORE INCHES IN WIDTH), COMBINATION BACKHOE FRONT END LOADER MACHINE WITH BACKHOE 1/2 YD BUCKET OR ATTACHMENTS. (ST. JOSEPH COUNTY) | $36.15 | $38.65 |
| HAND, HETHERINGTON DRIVER, MECHANICAL HEATER (1 TO 5), OUTBOARD OR INBOARD MOTOR BOAT, OILER, POWER SAW (CONCRETE POWER DRIVEN), WATER PUMP, GRASSCUTTER. (LAKE, LAPORTE, PORTER AND ST. JOSEPH COUNTIES) | $45.90 | $43.40 |
| SEAMAN TILLER, SKID STEER LOADERS, SPIKE MACHINE (RR), STRIPPING MACHINE (PAINT, SELF-PROPELLED), THROTTLE VALVE, WELDING MACHINE, WELL POINTS SYSTEM. (LAKE, LAPORTE, PORTER AND ST. JOSEPH COUNTIES) | $46.95 | $43.40 |
| SE MATERIAL), TRACTAIRE WITH DRILL, TRACTOR (WITH ALL DRAWN ATTACHEMENTS EXCEPT BACKHOE AND INCLUDING HIGHLIFT, ENDLOADER OF 1 CU. YD. CAPACITY AND LESS. (LAKE, LAPORTE, PORTER AND ST. JOSEPH COUNTIES) | $48.15 | $43.40 |
| MUTIPLE VIBRATING, ASPHALT WATERBOUND MACADAM, BITUMINOUUS MACADAM, BRICK SURFACE), TRACTOR (PUSH), TRACTOR WITH SCOOP, WIDENER, APSCO OR SIMILAR TYPE. (LAKE, LAPORTE, PORTER AND ST. JOSEPH COUNTIES) | $48.60 | $43.40 |
| TO CLASS L HOURLY RATE FOR EACH MACHINE ATTACHED THERE TO). (LAKE, LAPORTE, PORTER AND ST. JOSEPH COUNTIES) | $49.05 | $43.40 |
| IRONWORKER (ST. JOSEPH AND LAPORTE (REMAINDER OF COUNTY) COUNTIES) | $39.76 | $25.00 |
| inges IRONWORKER: STRUCTURAL & ORNAMENTAL (LAKE, PORTER AND LAPORTE (FROM LAKE MICHIGAN ON NORTH TO 50 MILES S. OF LAKE MICHIGAN ON THE S. AND FROM IN/IL STATE LINE ON W. TO 3 MILES E. OF IN. COUNTIES) | $47.75 | $41.28 |
| IRONWORKER: SHEETER (LAKE, PORTER AND LAPORTE (FROM LAKE MICHIGAN ON NORTH TO 50 MILES S. OF LAKE MICHIGAN ON THE S. AND FROM IN/IL STATE LINE ON W. TO 3 MILES E. OF IN. COUNTIES) | $48.00 | $41.28 |
| per hour 16 - 20 lbs. 1.50 per hour 21 - 26 lbs. 2.00 per hour 27 - 33 lbs. 3.00 per hour 34 & over 4.00 per hour | $40.30 | $28.90 |
| LABORERS: BUILDING CONSTRUCTION: GROUP 3 DYNAMITE MEN; DRILLERS, AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES. (LAKE COUNTY (WESTERN HALF)) | $40.26 | $28.90 |
| IBRATORS AND CHPPING HAMMER OPERATORS; ASBESTOS REMOVAL; HAZARDOUS WASTE REMOVAL; ALL BOILER SETTERS LABORERS, INCLUDING EXPEDITERS, BOTTOM MEN, BELL MEN, AND MASON TENDERS (LAKE COUNTY (WESTERN HALF)) | $40.01 | $28.90 |
| ALT PAVER; CHAIN SAW AND DEMOLITION SAW OPERATORS; CONCRETE SAW; CONCRETE CONVEYOR ASSEMBLERS; APPLYING OF CURING COMPOUND; SINKING OF WELLPOINTS; DEWATERING HEADER SYSTEMS (LAKE COUNTY (WESTERN HALF)) | $39.26 | $28.90 |
| LABORERS: UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN, DYNAMITE AND POWDER MAN, CONCRETE BARRIER RAIL FORM SETTER, CONCRETE SAW JOINT CONTROL CUTTING (LAKE COUNTY) | $34.45 | $27.50 |
| UTILITY CONSTRUCTION: GROUP 2 CUTTING TORCH BURNER, LASER BEAM ALIGNER, MANHOLE ERECTOR, SEWER PIPE LAYER, WATER LINE INSTALLER, TEMPORARY OR PERMANENT WELDERS (ELECTRIC OR OXY ACETYLENE) (LAKE COUNTY) | $33.75 | $27.50 |
| OWER MAN, SUBSUREFACE DRAIN AND CULVERT PIPE LAYER, CONCRETE CONVEYOR, HORIZONAL BORING AND JACKMAN AND SHEETMAN, PIPE GREADE MAN, WINCH AND WINDLESS OPERATOR CONDUIT INSTALLER, SOD LAYER (LAKE COUNTY) | $33.45 | $27.50 |
| ONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; DYNAMITE AND POWDER MAN; CONCRETE BARRIER RAIL FORM SETTER; GENERAL LABORER; CONCRETE SAW, JOINT CONTROL CUTTING (LAKE, LA PORTE, AND PORTER COUNTIES) | $34.45 | $27.50 |
| P 2 CUTTING TORCH BURNER: LASER BEAM ALIGNER; MANHOLE ERECTOR; SEWER PIPE LAYER; WATER LINE INSTALLER, TEMPORARY OR PERMANENT; WELDERS (ELECTRIC OR OXY-ACETYLENE). (LAKE, LA PORTE, AND PORTER COUNTIES) | $33.75 | $27.50 |
| IN AND CULVERT PIPE LAYER; CONCRETE CONVEYOR; HORIZONIAL BORING AND JACKMAN AND SHEETMAN; PIPE GRADE MAN; WINCH AND WINDLASS OPERATOR CONDUIT INSTALLER, SOD LAYER. (LAKE, LA PORTE, AND PORTER COUNTIES) | $33.45 | $27.50 |
| UTILITY CONSTRUCTION: GROUP 3 AIR TRACK AND WAGON DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CONCRETE SAW JOINT CONTROL CUTTING (LA PORTE & PORTER COUNTIES) | $34.45 | $27.50 |
| PERMANENT; WELDER (ELECTRIC OR EXY-ACETYLENE) IN CONNECTION WITH WATERLINE AND SEWER WORK, HOD CARRIER (TENDING BRICKLAYERS); TVING AND ASSOCIATED GROUTING OF UTILITY LINES (LA PORTE & PORTER COUNTIES) | $33.75 | $27.50 |
| LABORERS: GROUP 3 DYNAMITE MEN; DRILLERS, AIR TRACK OR WAGON DRILLING FOR EXPLOSIVES; LABORER SPECIALIST (LAKE (EASTERN HALF), LA PORTE, AND PORTER COUNTIES) | $40.89 | $30.30 |
| TOOL OPERATORS AND ALL PHEUMATIC TOOL OPERATORS; AIR AND ELECTRIC VIBRATORS AND CHIPPING HAMMER OPERATORS; ASBESTOS REMOVAL; HAZARDOUS WASTE REMOVAL (LAKE (EASTERN HALF), LA PORTE, AND PORTER COUNTIES) | $40.64 | $30.30 |
| TOR; WATER MAIN AND CABLE DUCKING; SCREED MAN OR SCREW OPERATOR ON ASPHALT PAVER; CHAIN SAW AND DEMOLITION SAW OPERATOR; CONCRETE CONVEYOR ASSEMBLER (LAKE (EASTERN HALF), LA PORTE, AND PORTER COUNTIES) | $39.89 | $30.30 |
| LABORERS:: GROUP 3 (ST JOSEPH COUNTY) (BUILDING CONSTRUCTION) | $31.88 | $18.70 |
| LABORERS:: GROUP 2 (ST JOSEPH COUNTY) (BUILDING CONSTRUCTION) | $30.38 | $18.70 |
| LABORERS:: GROUP 1 (ST JOSEPH COUNTY) (BUILDING CONSTRUCTION) | $29.88 | $18.70 |
| LABORERS:: GROUP 3 (ST JOSEPH COUNTY) (UTILITY CONSTRUCTION) | $31.65 | $18.00 |
| LABORERS:: GROUP 2 (ST JOSEPH COUNTY) (UTILITY CONSTRUCTION) | $31.15 | $18.00 |
| LABORERS:: GROUP 1 (ST JOSEPH COUNTY) (UTILITY CONSTRUCTION) | $30.65 | $18.00 |
| BORERS: GROUP 3 (HEAVY AND HIGHWAY CONSTRUCTION) AIR TRACK AND WAGE DRILLMAN; CONCRETE BARRIER RAIL FORM SETTER; DYNAMITE AND POWDER MAN; GENERAL LEADMAN; CONCRETE SAW JOINT CUTTING (ST. JOSEPH COUNTY) | $28.40 | $17.22 |
| RARY OR PERMANENT; WELDER (ELECTRIC OR EXY-ACETYLENE) IN CONNECTION WITH WATERLINE AND SEWER WORK, HOD CARRIER (TENDING BRICKLAYERS); TVING AND ASSOCIATED GROUTING OF UTILITY LINES. (ST. JOSEPH COUNTY) | $27.90 | $17.22 |
| ER MAN; SUBSURFACE DRAIN AND CULVERT PIPE LAYER; CONCRETE CONVEYOR ASSEMBLY MAN; HORIZONTAL BORING AND JACKING MAN; JACKMAN AND SHEETMAN; PIPE GRADE MAN; WINCH AND WINDLASS OPERATOR (ST. JOSEPH COUNTY) | $27.40 | $17.22 |
| INCLUDING HAMMOND AREA) | $53.55 | $44.88 |
| PAINTER: SPRAY (LA PORTE (EVERYTHING EAST OF HWY 39 AND NORTH OF HWY 20, INCLUDING THE CITIES OF LAPORTE AND MICHIGAN CITY); ST. JOSEPH COUNTIES) | $33.00 | $19.86 |
| INTER: BRUSH & ROLLER, DRYWALL TAPING & FINISHING, VINYL/PAPER HANGING (LA PORTE (EVERYTHING EAST OF HWY 39 AND NORTH OF HWY 20, INCLUDING THE CITIES OF LAPORTE AND MICHIGAN CITY); ST. JOSEPH COUNTIES) | $32.50 | $19.86 |
| PAINTERS: PAINTER (PORTER, LAKE AND THE REMAINDER OF LA PORTE COUNTY)) | $41.00 | $31.26 |
| PAINTERS: DRYWALL FINISHING (PORTER, LAKE AND THE REMAINDER OF LA PORTE COUNTY)) | $41.00 | $31.26 |
| EXCLUDING HAMMOND AREA), LAPORTE AND PORTER COUNTIES) | $44.09 | $30.63 |
| GLAZIER (ST. JOSEPH COUNTY) | $34.22 | $24.67 |
| CEMENT MASON/CONCRETE FINISHER: HEAVY/HIGHWAY (ST. JOSEPH COUNTY) | $31.50 | $14.30 |
| PLASTERER: BUILDING CONSTRUCTION (ST. JOSEPH COUNTY) | $26.81 | $12.40 |
| CEMENT MASON/CONCRETE FINISHER: BUILDING CONSTRUCTION (ST. JOSEPH COUNTY) | $28.84 | $14.48 |
| CEMENT MASON/CONCRETE FINISHER: HEAVY & HIGHWAY CONSTRUCTION (LAKE COUNTY (EXCEPT BY THE NORTHEAST SECTION LYING NORTH OF CROWN POINT AND EAST OF GRIFFITH)) | $33.94 | $13.80 |
| PLASTERER (LAKE COUNTY (EXCEPT BY THE NORTHEAST SECTION LYING NORTH OF CROWN POINT AND EAST OF GRIFFITH)) | $32.70 | $17.70 |
| MASON/CONCRETE FINISHER: HEAVY & HIGHWAY CONSTRUCTION (LAKE COUNTY (NORTHWARD ON LAKE COUNTY LINE TO AND INCLUDING THE CITY OF MERRILLVILLE, BUT NOT THE CITY LIMITS OF CROWN POINT) AND PORTER COUNTIES) | $32.00 | $15.74 |
| CEMENT MASON/CONCRETE FINISHER: BUILDING CONSTRUCTION (LAKE COUNTY (NORTHWARD ON LAKE COUNTY LINE TO AND INCLUDING THE CITY OF MERRILLVILLE, BUT NOT THE CITY LIMITS OF CROWN POINT) AND PORTER COUNTIES) | $35.48 | $21.68 |
| PLASTERER (LAKE COUNTY (NORTHWARD ON LAKE COUNTY LINE TO AND INCLUDING THE CITY OF MERRILLVILLE, BUT NOT THE CITY LIMITS OF CROWN POINT) AND PORTER COUNTIES) | $33.28 | $17.32 |
| CEMENT MASON: BUILDING CONSTRUCTION (LAPORTE COUNTY, EASTERN PORTION OF PORTER COUNTY WEST TO BUT NOT INCLUDING CHESTERTON IN THE NORTH AND WEST TO AND INCLUDING KOUTS IN THE SOUTH) | $36.01 | $25.40 |
| PLUMBER, PIPEFITTER, STEAMFITTER (LA PORTE COUNTY (CITY OF LAPORTE) AND ST. JOSEPH COUNTIES) | $44.93 | $0.00 |
| PLUMBER (LAKE, LAPORTE (EXCLUDING THE CITY OF LAPORTE) AND PORTER COUNTIES) | $49.77 | $28.56 |
| PIPEFITTER (LAKE (ENTIRE COUNTY), LA PORTE (EXCLUDING THE CITY OF LA PORTE), PORTER (ENTIRE COUNTY)) | $48.50 | $31.12 |
| ROOFER: SLATE & TILE (LA PORTE AND ST. JOSEPH COUNTIES) | $36.05 | $21.04 |
| ROOFER: COMPOSITION (LA PORTE AND ST. JOSEPH COUNTIES) | $34.55 | $21.04 |
| ROOFER (LAKE AND PORTER COUNTIES) | $47.47 | $27.81 |
| SPRINKLER FITTERS (PORTER COUNTY (NORTH OF U.S. ROUTE 30)) | $48.10 | $27.05 |
| SPRINKLER FITTER | $44.20 | $27.88 |
| SHEET METAL WORKER (ST. JOSEPH COUNTY) | $44.45 | $30.43 |
| SHEET METAL WORKER (LAKE, LAPORTE, AND PORTER COUNTIES) | $52.96 | $31.41 |
| PER DAY & 460.00 PER WEEK | $34.02 | $0.00 |
| PER DAY & 460.00 PER WEEK | $33.52 | $0.00 |
| PER DAY & 460.00 PER WEEK | $33.37 | $0.00 |
| PER DAY & 460.00 PER WEEK | $33.17 | $0.00 |
| PER DAY & 460.00 PER WEEK | $32.67 | $0.00 |
| TRUCK DRIVER:GROUP 10 PICK-UP TRUCKS LAPORTE & ST. JOSEPH COUNTIES HEAVY AND HIGHWAY CONSTRUCTION | $34.54 | $20.51 |
| TRUCK DRIVER: GROUP12 ACEY WAGON (OVER 3 BUCKETS); QUAD AXLE TRUCKS; ARTICULATING DUMP LAPORTE & ST. JOSEPH COUNTIES HEAVY AND HIGHWAY CONSTRUCTION | $35.19 | $20.51 |
| TRUCK DRIVER: GROUP11 HELPERS; GREASERS; TIRE MEN; BATCH BOARD TENDERS; WAREHOUSEMAN LAPORTE & ST. JOSEPH COUNTIES HEAVY AND HIGHWAY CONSTRUCTION | $35.09 | $20.51 |
| OEHRING OR SIMILAR DUMPSTERS, TRACK TRUCKS, EUCLID BOTTOM DUMP AND HUG BOTTOM DUMP, TOURNATRAILERS, TOURNAROCKERS, ACEY WAGONS OR FOR SIMILAR EQUIPMENT (OVER 12 CU YDS.) (LAPORTE & ST. JOSEPH COUNTIES) | $35.09 | $20.51 |
| DEM SEMI TRUCKS; TRUCK MECHANICS AND WELDERS; HEAVY EQUIPMENT-TYPE WATER WAGON OVER 5,000 GALLONS; TRI-AXLE TRUCKS PULLING TILT-TOP TRAILER; LOW-BOYS, TANDEM-TANDEM AXLE (LAPORTE & ST. JOSEPH COUNTIES) | $35.04 | $20.51 |
| CU YDS OR LESS); MOBILE MIXER TRUCK; TANDEM AXLE TRUCKS PULLING TILT-TOP TRAILER; TANDEM - AXLE LOWBOY; TRI- AXLE BATCH TRUCK; TRI-AXLE GREASE AND MAINTENANCE TRUCK (LAPORTE & ST. JOSEPH COUNTIES) | $34.99 | $20.51 |
| SEMI-WATER TRUCK; SPRINKLER TRUCK; HEAVY EQUIPMENT-TYPE WATER WAGONS, 5,000 GALLONS AND UNDER; BUTUMINOUS DISTRIBUTORS (ONE-MAN) (LAPORTE & ST. JOSEPH COUNTIES) | $34.94 | $20.51 |
| EMI TRUCKS; FARM TRACTORS HAULING MATERIAL; MIXER TRUCKS (ALL TYPES); TRUCKS PULLING TILT-TOP TRAILER SINGLE AXLE; SINGLE AXLE LOW- BOYS; TRUCK-MOUNTED PAVEMENT BREAKERS (LAPORTE & ST. JOSEPH COUNTIES) | $34.89 | $20.51 |
| TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 4 TANDEM AXLE FUEL TRUCKS; TANDEM AXLE WATER TRUCKS; BUTUMINOUS DISTRIBUTORS (TWO-MAN) (LAPORTE & ST. JOSEPH COUNTIES) | $34.84 | $20.51 |
| GS; WINCH TRUCKS OR A-FRAMES WHEN USED FOR TRANSPORTATION PURPOSES; DRIVERS ON BATCH TRUCKS, WET OR DRY OVER 3 (34E) BATCHES AND TANDEM AXLE GREASE AND MAINTENANCE TRUCK (LAPORTE & ST. JOSEPH COUNTIES) | $34.79 | $20.51 |
| TRUCK DRIVER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2 SINGLE AXLE FUEL AND WATER TRUCKS (LAPORTE & ST. JOSEPH COUNTIES) | $34.74 | $20.51 |
| VER, HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1 SINGLE/BATCHES AXLE STRAIGHT TRUCKS; BATCH TRUCKS, WET OR DRY 3 (34E) AXLE OR LESS; SINGLE AXLE GREASE AND MAINTENANCE TRUCK (LAPORTE & ST. JOSEPH COUNTIES) | $34.69 | $20.51 |
| TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY CONSTRUCTION (INCLUDING ASPHALT PAVING WORK) (LAKE AND PORTER COUNTIES) (GROUP 6) | $36.60 | $35.48 |
| TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY CONSTRUCTION (INCLUDING ASPHALT PAVING WORK) (LAKE AND PORTER COUNTIES) (GROUP 5) | $36.15 | $35.48 |
| TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY CONSTRUCTION (INCLUDING ASPHALT PAVING WORK) (LAKE AND PORTER COUNTIES) (GROUP 4) | $38.20 | $35.48 |
| TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY CONSTRUCTION (INCLUDING ASPHALT PAVING WORK) (LAKE AND PORTER COUNTIES) (GROUP 3) | $38.00 | $35.48 |
| TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY CONSTRUCTION (INCLUDING ASPHALT PAVING WORK) (LAKE AND PORTER COUNTIES) (GROUP 2) | $37.80 | $35.48 |
| TRUCK DRIVER BUILDING, HEAVY AND HIGHWAY CONSTRUCTION (INCLUDING ASPHALT PAVING WORK) (LAKE AND PORTER COUNTIES) (GROUP 1) | $37.60 | $35.48 |
| PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $34.75 | $0.00 |
| PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $34.25 | $0.00 |
| PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.95 | $0.00 |
| PER WEEK B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.75 | $0.00 |
Related Wage Determinations
View directory →Davis-Bacon
IN20260045 (Rev 1)
Indiana • Madison
Davis-Bacon
IN20260007 (Rev 1)
Indiana • Jackson
Davis-Bacon
IN20260015 (Rev 1)
Indiana • Orange, Washington
Davis-Bacon
IN20260042 (Rev 1)
Indiana • Delaware
Davis-Bacon
IN20260049 (Rev 1)
Indiana • Clark, Floyd, Harrison +1
Davis-Bacon
IN20260050 (Rev 1)
Indiana • Clay, Sullivan, Vermillion +1