Davis-Bacon
IN20260049 (Rev 1)
Coverage: Indiana • Clark, Floyd, Harrison +1.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ELECTRICIAN | $27.00 | $18.29 |
| POWER EQUIPMENT OPERATOR: LOADER | $49.05 | $43.40 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $49.05 | $43.40 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $49.05 | $43.40 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $49.05 | $43.40 |
| POWER EQUIPMENT OPERATOR: ROLLER | $34.80 | $38.65 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $36.15 | $38.65 |
| LABORER: PIPELAYER | $31.74 | $23.63 |
| PLUMBER | $34.01 | $14.00 |
| ROOFER | $27.22 | $14.47 |
| LABORER: COMMON OR GENERAL | $16.53 | $0.85 |
| CARPENTER | $23.40 | $11.39 |
| BRICKLAYER | $26.27 | $4.31 |
| SHEET METAL WORKER | $41.86 | $28.82 |