Davis-Bacon
IN20260045 (Rev 1)
Coverage: Indiana • Madison.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $40.15 | $19.25 |
| POWER EQUIPMENT OPERATOR: LOADER | $42.15 | $37.20 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $42.15 | $36.05 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $42.15 | $37.20 |
| POWER EQUIPMENT OPERATOR: ROLLER | $34.80 | $38.65 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $36.15 | $38.65 |
| LABORER: PIPELAYER | $31.74 | $23.63 |
| PLUMBER | $34.01 | $14.00 |
| ROOFER | $27.22 | $14.47 |
| LABORER: COMMON OR GENERAL | $21.34 | $12.03 |
| ELECTRICIAN | $27.31 | $8.18 |
| CARPENTER | $23.40 | $11.39 |
| BRICKLAYER | $26.27 | $4.31 |
| SHEET METAL WORKER | $41.86 | $28.82 |
Related Wage Determinations
View directory →Davis-Bacon
IN20260050 (Rev 1)
Indiana • Clay, Sullivan, Vermillion +1
Davis-Bacon
IN20260012 (Rev 2)
Indiana • Spencer
Davis-Bacon
IN20260018 (Rev 1)
Indiana • Jay
Davis-Bacon
IN20260019 (Rev 1)
Indiana • Wayne
Davis-Bacon
IN20260023 (Rev 1)
Indiana • Decatur, Jefferson, Jennings +3
Davis-Bacon
IN20260047 (Rev 1)
Indiana • Benton, Carroll, Tippecanoe