PSC 39
Browse recent opportunities tagged with PSC 39. Open any notice for details, attachments, and the direct SAM.gov link.
FORKLIFT
Reason for amendment is to change the specification of the forklift that need to complete the mission.General Specifications (Varies by Model/Year) Load Capacity: 5000 lbs (2268 kg) Load Center: 24 inches (61 cm) Fuel: Gas or Diesel Tires: Pneumatic Engine Mazda 2…
Zylon Poly-Benzobisoxazole (PBO) Yarn with linear density of 278 dtex AS-13 and 1110 dtex AS-13
Synopsis: NASA/NSSC has a requirement for Zylon Poly-Benzobisoxazole (PBO) Yarn, 278 dtex 105 kg, 1110 dtex 20 kg. NASA/NSSC intends to issue a sole source contract to TEIJIN FRONTIER (U.S.A.), INC. 1412 Broadway RM 1500 New York, New York 10018-9278 United States…
LIFT BEAM
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| STOP-WORK ORDER (AUG 1989)|1|| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)|N/A|TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|N/A|N/A|N/A|||||| INSPECTION SYSTEM PROGRAM PLANS, OR PREMANUFACTURING…
LIFT BEAM
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|x||x|||||| STOP-WORK ORDER (AUG 1989)|1|| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)|N/A|TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|N/A|N/A|N/A|||||| INSPECTION SYSTEM PROGRAM PLANS, OR PREMANUFACTURING…
LIFT BEAM
Open to view details.
LIFT BEAM
Open to view details.
Explore related
Browse common filters found across the opportunities listed on this page.