BENDIX KING RADIOS
Bendix King Radios for Southwest Region's Wildland Fire Management Staff
Filter and search for solicitations and contract listings.
Bendix King Radios for Southwest Region's Wildland Fire Management Staff
PRE-SOLICITATION NOTICE - The government intends to award a Firm Fixed-Priced contract for the supply of two (2) audiometric booths. This will be a brand name or equal request for audiometric booths brand name or equal to the Eckel CL-M6 PR6, one…
Pre-Solicitation Synopsis W9127N26BA012 Garibaldi Depoe Bay Pipeline Dredging 2026 The U.S. Army Corps of Engineers Portland District intends to issue an Invitation for Bids (IFB) NO. W9127N26BA012 for Garibaldi Depoe Bay Pipeline Dredging 2026. The dredging project includes mandatory work at three…
Lawn and landscape maintenance services for Gore Substation, Gore Maintenance Unit, Weleetka Substation, and Tupelo Substation in accordance with the Performance Work Statement.
Award Notice: WA NP OLYM 115(1), Repair Storm Damage on Mora Road
See attachment - There is NO requirment to respond to this notice.
1. General. This is a SOURCES SOUGHT and is for informational/market research purposes only. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2. This Sources Sought is to gain…
Mowing Services for Doniphan, Idalia, Sikeston, Poplar Bluff & Piggott. In accordence with the Performance Work Statement.
Seeking a consultant to develop a cohesive Little Saigon brand identity system with visual, environmental, and experiential elements that can be implemented across public infrastructure and private properties.
Amendment 0003 changes vetting requirements to receive CUI labeled information. Contractor is still required to have conditional or final CMMC Level 2 (C3PAO) certification to be awarded Contract. The Seattle District is soliciting a project to construct a multi-building Special Tactics Complex…
Update 2/25/2026: Bid Tabulations posted to attachments. Update 2/24/2026: Bid Summary posted to attachments. Update 2/17/2026: Amendment A003 posted to attachments. Update 2/11/2026: QA_2-11-2026.pdf posted to attachments. Update 2/10/2026 : QA_2-10-2026.pdf posted to attachments. Update 2/9/2026: Amendment A002 posted to attachments. Update…
Repair and Replace Fence at Rogers Substation, Maricopa County, Arizona
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued. Solicitation number 127EAW26Q0016 is issued…
The scope of the project is to construct the replacement of two reinforced concrete pipe culverts with 141”wide x 86” high x 31’6” long aluminum arch culverts with prefabricated headwalls and wingwalls for the crossing tributaries of Horsepen Crk. Also included in…
The contractor shall provide and deliver one portable livestock corral systems that meets the following minimum specifications (the following specifications represent the minimum requirements and equivalent systems will be considered) See attached Statement of Work. Questions due by 27 Feb 2026.
This is a sources sought announcement in accordance with FAR 15.201 and in anticipation of a potential future procurement program. Southwest Regional Maintenance Center (SWRMC) is conducting market research to determine industry capability and interest to provide required paint, coatings, preservation products,…
The Southwest Virginia Regional Jail Authority is looking to purchase 2 individual Manual Tilt Kettles for our Tazewell location
The primary objective of Package #8 Segment 4 East E2 Clinton (E2C) consists of constructing an upland dredged material confined placement area (DMPA) to receive maintenance dredging material from future dredging Project 11 - Segment 4, located within the Houston Ship Channel…