Filter and search for solicitations and contract listings.
This is a COMBINED SYNOPSIS/SOLICITATION for commercial items prepared in accordance with the information in FAR part 12, as supplemented with the additional information included in this notice. This announcement constitutes the only solicitation; a written solicitation will not be issued. PAPER…
Please be advised that this opportunity is only open to Contractors on INDEFINITE DELIVERY/ INDEFINITE QUANTITY (IDIQ), MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR DESIGN-BUILD (DB)/ DESIGN-BID-BUILD (DBB) WATERFRONT CONSTRUCTION PROJECTS, HAMPTON ROADS AREA OF OPERATIONS, VIRGINIA ML-C00082 (Contract Nos. N4008524D2503 - N4008524D2507)…
Frozen Eggs Pails - CDOC Warehouse
This requirement is for Non-electrical wire. Please see attached combined synopsis.
See attached document labeled Notice of Intent to Sole Source 36C25626Q0401 for details.
The Federal Emergency Management Agency (FEMA) awarded a Multiple Award (MA) Indefinite-Delivery-Indefinite-Quantity (IDIQ) contract for the primary purpose of conducting damage assessments in response to presidentially declared disasters throughout the United States and its territories (CONUS & OCONUS). This action was competitively…
See Attached: P03 J_A Security_Executed
The Federal Emergency Management Agency (FEMA) awarded a Multiple Award (MA) Indefinite-Delivery-Indefinite-Quantity (IDIQ) contract for the primary purpose of conducting damage assessments in response to presidentially declared disasters throughout the United States and its territories (CONUS & OCONUS). This action was competitively…
This procurement is restricted to the Roofing MACC contractors. Only the Roofing MACC contractors listed on the RFP cover letter may submit a proposal. See attached documents for scope of work and any applicable drawings. Amendment 0001
Update 0003 is for Extending the due date Southern Systems Industrial Conveyors Mark No. 12402-WA96-1.5.7Loader Drop Rail Section with Stop Assembly The loader drop rail section with stop assembly includes the rail transfer section to bridge the monorail gap, position locking hardware…
STATEMENT OF WORK The contractor shall provide all services, labor, travel, transportation, material, shipping, parts, connections, and equipment necessary for provision and on-site installation of equipment to provide a minimum of two Vision 1327 Cart and Utensil Washer/Disinfectors located at 4801 Linwood…
Presolicitation Notice Presolicitation Notice Page 3 of 3 Pre Solicitation Notice *=Required Field Solicitation Notice Page 1 of 3 DESCRIPTION Presolicitation Notice Presolicitation Notice Page 4 of 4 Page 1 of 2 *=Required Field Presolicitation Notice Page 1 of 4 Page 1…
This is a public synopsis of a forthcoming solicitation in accordance with FAR 36.213-2. This is NOT a solicitation, and no solicitation documents are currently publicly available. This pre-solicitation notice is for Solicitation Number 36C24226B0040 Project Number 630-26-101 for the Oncology Pharmacy…
This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format Revolutionary FAR Overhaul (RFO) in Federal Acquisition Regulation (FAR) subpart 12.202, “Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services,” as supplemented…
THIS IS A REQUEST FOR INFORMATION (RFI) AND SOURCES SOUGHT NOTICE (SSN) for General Contractor Services for enabling work associated with the Annex for the Clemente Ruiz Nazario U.S. Courthouse located in San Juan, Puerto Rico (PR) . THIS IS NOT A…
AMENDMENT 4: Uploading the following documents from Industry Day 15 September 2025: List of participants. Q&As. ACC-Orlando slide deck SATMO technical slide deck List of current MATOC Contractors. AMENDMENT 3: For the SECNAV 5512 form the POC is Mr. David Calkins, email:…