Skip to content
The M-ARK Project Inc

Radon Mitigation- Arkville, NY

Solicitation: Not available
Notice ID: 2132779
DepartmentThe M-ARK Project IncStateNYPostedMar 13, 2026, 12:00 AM UTCDueApr 03, 2026, 12:00 AM UTCCloses in 21 days

Federal opportunity from The M-ARK Project Inc. Place of performance: NY. Response deadline: Apr 03, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$394,928,985
Sector total $394,928,985 • Share 100.0%
Live
Median
$133,580
P10–P90
$32,637$752,022
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($394,928,985)
Deal sizing
$133,580 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for NY
Live POP
Place of performance
19 George Street Arkville NY 12406
State: NY
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
NY20260002 (Rev 1)
Match signal: state matchOpen WD
Published Jan 30, 2026New York • Albany, Columbia, Fulton +7
Rate
Asbestos/Insulator Worker SCOPE OF WORK: includes application of all insulating materials, protective, coverings, coating and finishing to all types of mechanical systems
Base $41.74Fringe $27.58
Rate
HANDLER Duties limited to preparation wetting; stripping; removal; scrapping; vacuuming; bagging; and disposing of all insulation materials, whether they contain asbestos or not from mechancial systems
Base $41.74Fringe $27.58
+91 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 91 more rate previews.
Davis-BaconBest fitstate match
NY20260002 (Rev 1)
Open WD
Published Jan 30, 2026New York • Albany, Columbia, Fulton +7
Rate
Asbestos/Insulator Worker SCOPE OF WORK: includes application of all insulating materials, protective, coverings, coating and finishing to all types of mechanical systems
Base $41.74Fringe $27.58
Rate
HANDLER Duties limited to preparation wetting; stripping; removal; scrapping; vacuuming; bagging; and disposing of all insulation materials, whether they contain asbestos or not from mechancial systems
Base $41.74Fringe $27.58
Rate
BOILERMAKER
Base $43.34Fringe $27.66
+90 more occupation rates in this WD
Davis-Baconstate match
NY20260008 (Rev 1)
Open WD
Published Jan 30, 2026New York • Cattaraugus, Chautauqua, Erie
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR (include application of all materials, protective coverings, coatings, and finishings to all types of mechanical systems)
Base $37.65Fringe $30.69
Rate
HAZARDOUS MATERIAL HANDLER
Base $34.15Fringe $26.09
Rate
BOILERMAKER
Base $39.35Fringe $33.18
+77 more occupation rates in this WD
Davis-Baconstate match
NY20260034 (Rev 1)
Open WD
Published Jan 30, 2026New York • Orleans
Rate
gs, coatings, and finishes to all types of mechanical systems. Also, the application of firestooping material openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement)
Base $40.26Fringe $25.41
Rate
NDLER Duties limited to Preparation; wetting; stripping; removal; scrapping; vacuuming; bagging; and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems
Base $40.26Fringe $25.41
Rate
BOILERMAKER
Base $39.35Fringe $33.18
+50 more occupation rates in this WD
Davis-Baconstate match
NY20260001 (Rev 1)
Open WD
Published Jan 30, 2026New York • Albany, Allegany, Bronx +59
Rate
Dredging: CLASS A1
Base $48.48Fringe $15.34
Rate
b CLASS A2
Base $43.20Fringe $14.99
Rate
b CLASS B1
Base $41.93Fringe $14.90
+4 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
The M-ARK Project Inc
Agency
Not available
Subagency
Not available
Office
Environmental
Contracting Office Address
Not available

Description

19 George Street Arkville NY 12406 • Environmental • General

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.