Skip to content
Ok

For Sale: 2011 Ford F150, John Deere F525 48" Mower, 2005 John Deere 6

Solicitation: Not available
Notice ID: 872fc78e107c0f88dc1cfb39c1b181719b293897
DepartmentOkStateOKPostedJan 23, 2026, 12:00 AM UTCDueFeb 04, 2026, 12:00 AM UTCExpired

Federal opportunity from OK. Place of performance: OK. Response deadline: Feb 04, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$386,765,285
Sector total $386,765,285 • Share 100.0%
Live
Median
$129,570
P10–P90
$32,637$689,094
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($386,765,285)
Deal sizing
$129,570 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Oklahoma
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OK20260049 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Oklahoma • Oklahoma
Rate
BRICKLAYER
Base $26.92Fringe $13.09
Rate
MILLWRIGHT
Base $32.75Fringe $11.91
+40 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 40 more rate previews.
Davis-BaconBest fitstate match
OK20260049 (Rev 1)
Open WD
Published Jan 23, 2026Oklahoma • Oklahoma
Rate
BRICKLAYER
Base $26.92Fringe $13.09
Rate
MILLWRIGHT
Base $32.75Fringe $11.91
Rate
CARPENTER (Form Work Only)
Base $27.79Fringe $10.05
+39 more occupation rates in this WD
Davis-Baconstate match
OK20260045 (Rev 1)
Open WD
Published Jan 23, 2026Oklahoma • Grady
Rate
BRICKLAYER
Base $26.92Fringe $13.09
Rate
MILLWRIGHT
Base $32.75Fringe $11.91
Rate
CARPENTER (Form Work Only)
Base $27.79Fringe $10.05
+38 more occupation rates in this WD
Davis-Baconstate match
OK20260042 (Rev 1)
Open WD
Published Jan 23, 2026Oklahoma • Cleveland
Rate
BRICKLAYER
Base $26.92Fringe $13.09
Rate
MILLWRIGHT
Base $32.75Fringe $11.91
Rate
CARPENTER (Form Work Only)
Base $27.79Fringe $10.05
+38 more occupation rates in this WD
Davis-Baconstate match
OK20260054 (Rev 1)
Open WD
Published Jan 23, 2026Oklahoma • Le Flore, Sequoyah
Rate
BRICKLAYER
Base $26.92Fringe $13.09
Rate
ELECTRICIAN
Base $30.03Fringe $14.03
Rate
POWER EQUIPMENT OPERATOR: Group 1
Base $38.09Fringe $19.05
+23 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
OK
Agency
Not available
Subagency
Not available
Office
OK
Contracting Office Address
Not available

Description

Federal opportunity from OK. Place of performance: OK. Response deadline: Feb 04, 2026.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.