Skip to content
Minnesota Department of Natural Resources

Brainerd Co-Located Office Roof Replacement

Solicitation: Not available
Notice ID: mn_osp__10215336
DepartmentMinnesota Department of Natural ResourcesStateMNPostedMay 19, 2026, 12:00 AM UTCDueJun 11, 2026, 02:00 PM UTCCloses in 18 daysBid range$432,739 - $512,876
Contract snapshot

Federal opportunity from Minnesota Department of Natural Resources • Minnesota Department of Natural Resources. Place of performance: MN. Response deadline: Jun 11, 2026.

Source
Open on official portal →
Solicitation
mn_osp__10215336
Performance
Brainerd, MN • US
Response
Jun 11, 2026, 02:00 PM UTC
Open on official portal →
Map for MN
Live POP
Place of performance
Brainerd, MN • US
State: MN
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Minnesota Department of Natural Resources
Agency
Minnesota Department of Natural Resources
Subagency
Minnesota Department of Natural Resources
Office
Not available
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MN20260032 (Rev 1)
Published May 18, 2026Minnesota • Big Stone
53 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 51 more rate previews.
Davis-BaconBest fitstate match
MN20260032 (Rev 1)
Open WD
Published May 18, 2026Minnesota • Big Stone
Rate
WIRING SYSTEMS INSTALLER
Base $31.25Fringe $16.34
Rate
WIRING SYSTEM TECHNICIAN
Base $44.61Fringe $20.16
Rate
UNDERGROUND AND OPEN DITCH LABORER (EIGHT FEET BELOW STARTING GRADE LEVEL)
Base $22.09Fringe $14.90
+50 more occupation rates in this WD
Davis-Baconstate match
MN20260008 (Rev 1)
Open WD
Published May 18, 2026Minnesota • McLeod, Sibley
Rate
HANICAL SYSTEMS. INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS WHETHER THEY CONTAIN ASBESTOS OR NOT)
Base $55.34Fringe $34.03
Rate
BOILERMAKER
Base $48.00Fringe $31.14
Rate
BRICKLAYER: BRICKLAYER, BLOCKLAYER, CAULKER, CLEANER, POINTER, STONEMASON (SIBLEY COUNTY)
Base $45.11Fringe $25.61
+63 more occupation rates in this WD
Davis-Baconstate match
MN20260087 (Rev 1)
Open WD
Published May 18, 2026Minnesota • Pope
Rate
WIRING SYSTEMS INSTALLER
Base $33.44Fringe $17.82
Rate
WIRING SYSTEM TECHNICIAN
Base $47.73Fringe $22.24
Rate
UNDERGROUND AND OPEN DITCH LABORER (EIGHT FEET BELOW STARTING GRADE LEVEL)
Base $36.00Fringe $24.26
+53 more occupation rates in this WD
Davis-Baconstate match
MN20260042 (Rev 1)
Open WD
Published May 18, 2026Minnesota • Cook
Rate
WIRING SYSTEMS INSTALLER
Base $31.25Fringe $16.34
Rate
WIRING SYSTEM TECHNICIAN
Base $44.61Fringe $20.16
Rate
UNDERGROUND AND OPEN DITCH LABORER (EIGHT FEET BELOW STARTING GRADE LEVEL)
Base $32.48Fringe $20.27
+44 more occupation rates in this WD

Description

Federal opportunity from Minnesota Department of Natural Resources • Minnesota Department of Natural Resources. Place of performance: MN. Response deadline: Jun 11, 2026.
Advisory bid range

Pricing and bid posture

medium confidence
$432,739 - $512,876

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$432,739
Target
$457,925
Premium
$512,876
Labor
$132,040
Direct
$157,000
Burden
$104,117
Fee + reserve
$53,969
Target $457,925Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,508,452,282
Sector total $3,508,452,282 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,556$3,256,200
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,508,452,282)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.