Davis-Bacon
MN20260032 (Rev 1)
Coverage: Minnesota • Big Stone.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| WIRING SYSTEMS INSTALLER | $31.25 | $16.34 |
| WIRING SYSTEM TECHNICIAN | $44.61 | $20.16 |
| UNDERGROUND AND OPEN DITCH LABORER (EIGHT FEET BELOW STARTING GRADE LEVEL) | $22.09 | $14.90 |
| MP PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-PROPELLED PACKER UNDER 8 TONS; TWO AXLE UNIT; SLURRY OPERATOR; TANK TRUCK HELPER (GAS, OIL, ROAD OIL, AND WATER); TRACTOR OPERATOR, UNDER 50 H.P | $16.00 | $0.00 |
| TRUCK DRIVER: GROUP 3: BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR (ONE PERSON OPERATION); THREE AXLE UNITS | $23.66 | $16.20 |
| TRUCK DRIVER: GROUP 2: FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK | $26.00 | $0.00 |
| TRUCK DRIVER: GROUP 1: MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER (HAULING MACHINERY INCLUDING OPERATION OF HAND AND POWER OPERATED WINCHES) | $18.00 | $1.25 |
| TILE SETTER | $30.66 | $10.53 |
| TERRAZZO WORKER | $37.58 | $16.83 |
| UREMENT; MARK AND DRIVE STAKES; HAND OR POWER DIGGING FOR AND IDENTIFICATION OF MARKERS OR MONUMENTS; PERFORM AND CHECK CALCULATIONS; REVIEW AND UNDERSTAND CONSTRUCTION PLANS AND LAND SURVEY MATERIALS) | $24.76 | $17.69 |
| UREMENT; MARK AND DRIVE STAKES; HAND OR POWER DIGGING FOR AND IDENTIFICATION OF MARKERS OR MONUMENTS; PERFORM AND CHECK CALCULATIONS; REVIEW AND UNDERSTAND CONSTRUCTION PLANS AND LAND SURVEY MATERIALS) | $26.51 | $17.69 |
| SPRINKLER FITTER | $43.53 | $26.67 |
| SIGN ERECTOR | $23.69 | $8.12 |
| SHEET METAL WORKER | $40.23 | $30.02 |
| ROOFER | $21.00 | $1.95 |
| TABLE NOT CRUSHING OR WASHING); LEVER PERSON; POWER SWEEPER; SHEEP FOOT ROLLER AND ROLLERS ON GRAVEL COMPACTION, INCLUDING VIBRATING ROLLERS; TRACTOR, WHEEL TYPE, OVER 50 H.P., UNRELATED TO LANDSCAPING | $23.00 | $19.70 |
| P FOOT COMPACTOR WITH BLADE . 200 H.P. AND OVER; SHOULDERING MACHINE (POWER) APSCO OR SIMILAR TYPE INCLUDING SELF-PROPELLED SAND AND CHIP SPREADER; STUMP CHIPPER AND TREE CHIPPER; TREE FARMER (MACHINE) | $31.50 | $0.00 |
| PROPELLED SOIL STABILIZER; SLIP FORM (POWER DRIVEN) (PAVING); TIE TAMPER AND BALLAST MACHINE; TRACTOR, WHEEL TYPE, OVER 50 H.P. WITH PTO UNRELATED TO LANDSCAPING; TUB GRINDER, MORBARK, OR SIMILAR TYPE | $35.00 | $0.00 |
| STABILIZER PLANT; CABLEWAY; DERRICK (GUY OR STIFFLEG)(POWER)(SKIDS OR STATIONARY); DREDGE OR ENGINEERS, DREDGE (POWER) AND ENGINEER; LOCOMOTIVE CRANE OPERATOR; TANDEM SCRAPER; TUGBOAT 100 H.P AND OVER | $36.50 | $0.00 |
| POWER EQUIPMENT OPERATOR: HIGHWAY/HEAVY GROUP 2: GRADER OR MOTOR PATROL; TUGBOAT 100 H.P. AND OVER WHEN LICENSE REQUIRED | $40.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 8: ELEVATOR OPERATOR; GREASER; MECHANICAL SPACE HEATER (TEMPORARY HEAT NO BOILER LICENSE REQUIRED) | $30.90 | $19.45 |
| ILER LICENSE; OILER (POWER SHOVEL, CRANE, TRUCK CRANE, DRAGLINE, CRUSHERS AND MILLING MACHINES, OR OTHER SIMILAR POWER EQUIPMENT); PICK UP SWEEPER (ONE CUBIC YARD HOPPER CAPACITY); PUMP AND/OR CONVEYOR | $41.73 | $26.40 |
| ANT; FIREPERSON, FIRST CLASS BOILER LICENSE; FRONT END, SKID STEER UP TO 1 C YD; GUNITE MACHINE; TRACTOR OPERATOR D2 OR SIMILAR SIZE; TRENCHING MACHINE (SEWER, WATER, GAS) EXCLUDES WALK BEHIND TRENCHER | $21.00 | $6.55 |
| EQUAL TO 100KW AND OVER); PUMP OPERATOR AND/OR CONVEYOR (TWO OR MORE MACHINES); SELF-ERECTING TOWER CRANE UNDER 100 FEET MEASURED FROM BOOM FOOT PIN; STRADDLE CARRIER; TRACTOR OVER D2; WELL POINT PUMP | $39.97 | $22.85 |
| RCIAL GROUP 4: CRAWLER BACKHOE INCLUDING ATTACHMENTS; FIREPERSON, CHIEF BOILER LICENSE; HOIST ENGINEER (THREE DRUMS OR MORE); LOCOMOTIVE; OVERHEAD CRANE (INSIDE BUILDING PERIMETER); TRACTOR . BOOM TYPE | $41.38 | $22.85 |
| G TOWER CRANE 100 FEET AND OVER MEASURED FROM BOOM FOOT PIN; STATIONARY TOWER CRANE UP TO 200 FEET; TRAVELING TOWER CRANE; TRUCK OR CRAWLER CRANE UP TO AND NOT INCLUDING 150 FEET OF BOOM, INCLUDING JIB | $47.02 | $26.88 |
| FEET AND OVER; CONCRETE PUMP WITH 50 METERS/164 FEET OF BOOM AND OVER; PILE DRIVING WHEN THREE DRUMS IN USE; TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP TO AND NOT INCLUDING 200 FEET, INCLUDING JIB | $48.53 | $26.40 |
| POWER EQUIPMENT OPERATOR: COMMERCIAL GROUP 1: HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER CRANE WITH 200 FEET OF BOOM AND OVER, INCLUDING JIB | $43.35 | $22.85 |
| PLUMBER | $51.04 | $30.58 |
| PLASTERER | $25.47 | $14.88 |
| PIPELAYER (WATER, SEWER AND GAS) | $15.00 | $0.00 |
| PIPEFITTER/STEAMFITTER | $48.24 | $34.70 |
| PILEDRIVER (INCLUDING VIBRATORY DRIVER OR EXTRACTOR FOR PILING AND SHEETING OPERATIONS) | $27.46 | $16.11 |
| PAVEMENT MARKING OR MARKING REMOVAL EQUIPMENT ((ONE OR TWO PERSON OPERATORS); SELF-PROPELLED TRUCK OR TRAILER MOUNTED UNITS.) | $14.24 | $0.76 |
| PAINTER (INCLUDING HAND BRUSHED, HAND SPRAYED, AND THE TAPING OF PAVEMENT MARKINGS) | $31.63 | $25.28 |
| MILLWRIGHT | $34.13 | $30.28 |
| SOD ROLLER, FARM TRACTOR WITH ATTACHMENT SPECIFICALLY SEEDING, SODDING, OR PLANT, AND TWO-FRAMED FORKLIFT (EXCLUDING FRONT, POSIT-TRACK, AND SKID STEER LOADERS), NO EARTHWORK OR GRADING FOR ELEVATIONS) | $11.13 | $0.00 |
| LABORER: SKILLED (ASSISTING SKILLED CRAFT JOURNEYMAN) | $36.06 | $24.39 |
| LABORER: LANDSCAPE (GARDENER, SOD LAYER AND NURSERY OPERATOR) | $17.50 | $0.00 |
| LABORER: COMMON OR GENERAL (GENERAL LABOR WORK) | $36.06 | $24.39 |
| IRONWORKER | $44.85 | $35.72 |
| HEATING AND FROST INSULATORS | $53.19 | $31.95 |
| GLAZIER | $48.98 | $26.75 |
| ELEVATOR CONSTRUCTORS | $57.49 | $43.71 |
| ELECTRICIAN | $46.00 | $30.00 |
| DRYWALL TAPER | $32.41 | $24.43 |
| CEMENT MASON | $40.97 | $8.84 |
| CARPET LAYER (LINOLEUM) | $25.44 | $9.77 |
| CARPENTER | $33.14 | $27.60 |
| BRICKLAYER | $48.38 | $26.38 |
| BOILERMAKER | $41.94 | $29.99 |
| ASBESTOS ABATEMENT WORKER | $39.86 | $24.61 |
| ARTICULATED HAULER | $17.50 | $0.00 |