Davis-Bacon
MN20260008 (Rev 1)
Coverage: Minnesota • McLeod, Sibley.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| HANICAL SYSTEMS. INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS WHETHER THEY CONTAIN ASBESTOS OR NOT) | $55.34 | $34.03 |
| BOILERMAKER | $48.00 | $31.14 |
| BRICKLAYER: BRICKLAYER, BLOCKLAYER, CAULKER, CLEANER, POINTER, STONEMASON (SIBLEY COUNTY) | $45.11 | $25.61 |
| MARBLE SETTER | $45.47 | $26.33 |
| BRICKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON (MCLEOD COUNTY) | $45.11 | $25.61 |
| TILE LAYER (SIBLEY COUNTY) | $34.92 | $21.81 |
| TILE LAYER (MCLEOD COUNTY) | $39.17 | $10.16 |
| TILE FINISHER | $28.50 | $8.20 |
| TERRAZZO WORKER/SETTER (MECHANIC) | $44.36 | $22.35 |
| TERRAZZO WORKER/SETTER (FINISHER) | $42.67 | $22.04 |
| TERRAZZO WORKER/SETTER (BASE MACHINE) | $40.60 | $21.94 |
| LATHER | $39.55 | $28.63 |
| MILLWRIGHT | $42.95 | $36.81 |
| CARPENTER: WOOD FRAME CONSTRUCTION (MCLEOD) | $36.71 | $20.17 |
| CARPENTER (MCLEOD) | $36.71 | $20.17 |
| CARPENTER & PILEDRIVERMEN (SIBLEY COUNTY (EASTERN 1/3)) | $36.71 | $20.17 |
| ADDITIONAL PER HOUR | $43.67 | $22.35 |
| ADDITIONAL PER HOUR | $44.12 | $22.57 |
| ELECTRICIAN (SIBLEY COUNTY) | $40.25 | $23.32 |
| FOR 6 MONTHS TO 5 YEARS OF SERVICE. B.PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | $62.52 | $38.44 |
| POWER EQUIPMENT OPERATOR GROUP 8 MECHANICAL SPACE HEATER (TEMPORARY HEAT); OILER OR GREASER; & ELEVATOR | $28.29 | $15.95 |
| UIPMENT OPERATOR GROUP 7 AIR COMPRESSOR 600 CFM OR OVER; PUMP AND/OR CONVEYOR; BRAKEMAN; PICK-UP SWEEPER (1 CU. YD. & OVER HOPPER CAPACITY); TRUCK CRANE OILER; & WELDING MACHINE, FIREMAN TEMPORARY HEAT | $30.30 | $15.95 |
| POWER EQUIPMENT OPERATOR GROUP 6 CONCRETE BATCH PLANT; GUNITE; TRACTOR D2 OR SIMILAR SIZE; & FRONT END LOADER, UP TO 1 CU. YD | $31.42 | $15.95 |
| TRUCTION; FRONT END LOADER (OVER 1 CU. YD.); HOIST ENGINEER (1 OR 2 DRUMS); STRADDLE CARRIER; POWER PLANT ENGINEER (100 KW & OVER ON MULTIPLES EQUAL TO 100KW & OVER); TRACTOR OVER D2; & WELL POINT PUMP | $32.93 | $15.95 |
| POWER EQUIPMENT OPERATOR GROUP 4 CRAWLER BACKHOE; HOIST ENGINEER (3 DRUMS OR MORE); LOCOMOTIVE OPERATOR; OVERHEAD CRANE OPERATOR (INSIDE BUILDING PERIMETER); & TRACTOR OPERATOR WITH BOOM | $33.10 | $15.95 |
| ARE USED); TRUCK & CRAWLER CRANE, UP TO BUT NOT INCLUDING 150' OF BOOM, INCLUDING JIB; DERRICK (GUY & STIFFLEG); TOWER CRANE (STATIONARY) UP TO 200'; & ALL TERRAIN VEHICLE CRANE, BOOM TRUCK OVER 100 FT | $33.44 | $15.95 |
| POWER EQUIPMENT OPERATOR GROUP 2 TRUCK & CRAWLER CRANE WITH 150' OF BOOM, UP TO BUT NOT INCLUDING 200' OF BOOM, INCLUDING JIB; & TOWER CRANE 200' & OVER, CONCRETE PUMP 164 FT BOOM | $34.85 | $15.95 |
| PREMIUM WITH 300' OF BOOM & OVER, INCLUDING JIB); & TOWER CRANE 250' & OVER | $35.19 | $15.95 |
| IRONWORKER | $43.00 | $34.11 |
| LANDSCAPER: SEEDING, SODDING , PLANTING OF EVERGREEN & DECIDUOUS SHRUBS & TREES ON ALL WORK, EXCEPT RESIDENTIAL OF 4 UNITS OR LESS (MCLEOD COUNTY) | $16.26 | $9.68 |
| GROUP 4 FLAGPERSON (MCLEOD COUNTY) | $19.17 | $15.79 |
| GROUP 3 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTER OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTAR, SILENT DYNAMITE, ETC. (MCLEOD COUNTY) | $21.88 | $15.79 |
| ANDBLASTING; PIPELAYER; PIPE RE-HABTECH; REFRACTORY WORKER; SHEETING SETTER & DRIVER, HEAVY BUILDING EXCAVATION; UNDERGROUND WORK-OPEN DITCH OR EXCAVATION 8' BELOW GRADE; & UNDERPINNING (MCLEOD COUNTY) | $21.97 | $15.79 |
| SCAFFOLDING); & TORCHMAN-GAS, ELECTRIC, THERMAL OR SIMILAR DEVICE (MCLEOD COUNTY) | $21.17 | $15.79 |
| OVER: GROUP 4 FLAGPERSON (MCLEOD COUNTY) | $20.84 | $16.57 |
| OVER: GROUP 3 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTER OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTAR, SILENT DYNAMITE, ETC. (MCLEOD COUNTY) | $23.54 | $16.57 |
| ANDBLASTING; PIPELAYER; PIPE RE-HABTECH; REFRACTORY WORKER; SHEETING SETTER & DRIVER, HEAVY BUILDING EXCAVATION; UNDERGROUND WORK-OPEN DITCH OR EXCAVATION 8' BELOW GRADE; & UNDERPINNING (MCLEOD COUNTY) | $23.64 | $16.57 |
| SCAFFOLDING); & TORCHMAN-GAS, ELECTRIC, THERMAL OR SIMILAR DEVICE (MCLEOD COUNTY) | $22.84 | $16.57 |
| LABORER (ASBESTOS ABATEMENT) | $30.83 | $17.61 |
| PLASTER TENDER | $21.97 | $15.79 |
| LANDSCAPER: SEEDING, SODDING , PLANTING OF EVERGREEN & DECIDUOUS SHRUBS & TREES ON ALL WORK, EXCEPT RESIDENTIAL OF 4 UNITS OR LESS (SIBLEY COUNTY) | $28.25 | $16.20 |
| GROUP 4 FLAGPERSON (SIBLEY COUNTY) | $16.35 | $13.94 |
| GROUP 3 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTER OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTAR, SILENT DYNAMITE, ETC. (SIBLEY COUNTY) | $19.06 | $13.94 |
| ANDBLASTING; PIPELAYER; PIPE RE-HABTECH; REFRACTORY WORKER; SHEETING SETTER & DRIVER, HEAVY BUILDING EXCAVATION; UNDERGROUND WORK-OPEN DITCH OR EXCAVATION 8' BELOW GRADE; & UNDERPINNING (SIBLEY COUNTY) | $19.15 | $13.94 |
| SCAFFOLDING); & TORCHMAN-GAS, ELECTRIC, THERMAL OR SIMILAR DEVICE (SIBLEY COUNTY) | $18.35 | $13.94 |
| OVER: GROUP 4 FLAGPERSON (SIBLEY COUNTY) | $18.04 | $14.70 |
| OVER: GROUP 3 DRILLER FOR BLASTING PURPOSES; DYNAMITE BLASTER OR SUBSTITUTE PRODUCTS TOVEX TR, WATER, GAS, GEL, BRISTAR, SILENT DYNAMITE, ETC. (SIBLEY COUNTY) | $20.74 | $14.70 |
| ANDBLASTING; PIPELAYER; PIPE RE-HABTECH; REFRACTORY WORKER; SHEETING SETTER & DRIVER, HEAVY BUILDING EXCAVATION; UNDERGROUND WORK-OPEN DITCH OR EXCAVATION 8' BELOW GRADE; & UNDERPINNING (SIBLEY COUNTY) | $20.84 | $14.70 |
| SCAFFOLDING); & TORCHMAN-GAS, ELECTRIC, THERMAL OR SIMILAR DEVICE (SIBLEY COUNTY) | $20.04 | $14.70 |
| PAINTERS: SPRAY; STEEL; SANDBLASTER; SWING STAGE & EPOXY (MCLEOD) | $31.45 | $17.85 |
| PAINTERS: BRUSH; ROLLER; & WALLPAPER HANGER (MCLEOD) | $31.45 | $17.85 |
| DRYWALL: SANDER (MCLEOD) | $22.63 | $18.67 |
| DRYWALL: FINISHER (MCLEOD) | $30.17 | $18.67 |
| DRYWALL TAPER/FINISHER (SIBLEY COUNTY) | $19.00 | $25.79 |
| PER HOUR ADDITIONAL | $35.28 | $25.49 |
| PER HOUR ADDITIONAL | $19.00 | $3.00 |
| GLAZIER | $50.98 | $27.35 |
| PLASTERER | $42.52 | $30.37 |
| CEMENT MASON/CONCRETE FINISHER | $46.46 | $23.47 |
| PLUMBER (MCLEOD) FOOTNOTE: PAID HOLIDAY: LABOR DAY | $59.54 | $33.26 |
| PLUMBER: INCLUDES GAS FITTERS FOOTNOTE: PAID HOLIDAY: LABOR DAY | $36.78 | $34.51 |
| PIPEFITTER (SIBLEY COUNTY) | $37.05 | $30.27 |
| PIPEFITTER (MCLEOD) | $48.33 | $40.46 |
| ROOFER FOOTNOTE: PAID HOLIDAY - LABOR DAY | $48.32 | $25.54 |
| SPRINKLER FITTER | $42.94 | $27.26 |
| SHEET METAL WORKER FOOTNOTE: PAID HOLIDAY - LABOR DAY | $45.01 | $26.53 |