Skip to content
SOS - Secretary of State

Change Order Notice: Call Center Services Extension of Sourcewell contract 071321-CEN

Solicitation: Not available
Notice ID: 26-350SOS-SOS35-B-51553

Federal opportunity from ITSOS350 - Information Technology • SOS - Secretary of State. Place of performance: IL. Response deadline: Mar 27, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$533,953,549
Sector total $533,953,549 • Share 100.0%
Live
Median
$139,000
P10–P90
$30,125$967,312
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($533,953,549)
Deal sizing
$139,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for IL
Live POP
Place of performance
Illinois Secretary of State 501 South 2nd Street 108 Howlett Building Springfield, IL 62756 US Email: procurement@ilsos.gov Phone: (000) 000-0000
State: IL
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
IL20260002 (Rev 3)
Match signal: state matchOpen WD
Published Jan 23, 2026Illinois • Alexander, Champaign, Christian +38
Rate
tes Fringes Asbestos Workers/Insulator Includes the application, installation, and cleanup of all insulating materials, protective coverings, coatings, and finishings to all types of mechanical systems
Base $43.48Fringe $27.24
Rate
ASBESTOS WORKER/INSULATOR Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems
Base $55.02Fringe $35.75
+182 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 182 more rate previews.
Davis-BaconBest fitstate match
IL20260002 (Rev 3)
Open WD
Published Jan 23, 2026Illinois • Alexander, Champaign, Christian +38
Rate
tes Fringes Asbestos Workers/Insulator Includes the application, installation, and cleanup of all insulating materials, protective coverings, coatings, and finishings to all types of mechanical systems
Base $43.48Fringe $27.24
Rate
ASBESTOS WORKER/INSULATOR Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems
Base $55.02Fringe $35.75
Rate
Fire Stop Technician
Base $44.02Fringe $32.76
+181 more occupation rates in this WD
Davis-Baconstate match
IL20260007 (Rev 1)
Open WD
Published Jan 16, 2026Illinois • Madison, St Clair
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $43.48Fringe $27.24
Rate
BOILERMAKER
Base $45.50Fringe $35.30
Rate
Bricklayer, Caulker, Cleaner, Pointer & Stonemason (including Marble Mason, Tile Layer)
Base $33.13Fringe $22.05
+62 more occupation rates in this WD
Davis-Baconstate match
IL20260037 (Rev 1)
Open WD
Published Jan 16, 2026Illinois • Union
Rate
BRICKLAYER
Base $30.79Fringe $21.69
Rate
Carpenter/Drywall Hanger (including Batt Insulator)
Base $31.30Fringe $18.90
Rate
ELECTRICIAN Work not to exceed 8-plex family housing units
Base $32.58Fringe $12.11
+7 more occupation rates in this WD
Davis-Baconstate match
IL20260024 (Rev 2)
Open WD
Published Jan 16, 2026Illinois • Williamson
Rate
BRICKLAYER
Base $30.79Fringe $21.69
Rate
Carpenter/Drywall Hanger (including Batt Insulator)
Base $31.30Fringe $18.90
Rate
ELECTRICIAN Work not to exceed 8-plex family housing units
Base $32.58Fringe $12.11
+7 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
SOS - Secretary of State
Agency
ITSOS350 - Information Technology
Subagency
ITSOS350 - Information Technology
Office
AB001 - Information Technology
Contracting Office Address
Not available

Description

Change Order Notice: Call Center Services Extension of Sourcewell contract 071321-CEN The Illinois Secretary of State's office is extending the current contract with 22nd Century Technologies to 6/30/26. The cooperative contract is through Sourcewell and is contract 071321-CEN. The cost of the extension is $602,000. Item # 1: ( 915 - 02 ) Call center and software services - estimated cost for software and staffing Call center and software services - estimated cost for software and staffing

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.