Davis-Bacon
IL20260007 (Rev 1)
Coverage: Illinois • Madison, St Clair.
Published: Jan 16, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $43.48 | $27.24 |
| BOILERMAKER | $45.50 | $35.30 |
| Bricklayer, Caulker, Cleaner, Pointer & Stonemason (including Marble Mason, Tile Layer) | $33.13 | $22.05 |
| CARPENTER (Lather, Piledriver, and Millwright) Building | $41.36 | $18.90 |
| Residential | $31.30 | $18.90 |
| Carpet Installer (Carpet, Linoleum, Hardwood, and Tile Layer) | $36.08 | $18.90 |
| ELECTRICIAN Building | $52.41 | $52.01 |
| Residential | $35.73 | $49.28 |
| ELECTRICAL LOW VOLTAGE WIRING INSTALLER | $35.27 | $15.65 |
| ne interconnect, field programming, inventory control systems, microwave transmission, multi-media, multiplex, radio page, school, intercom and sound burglar alarms and low voltage master clock systems | $36.91 | $20.99 |
| ELECTRICIAN Building Construction | $47.43 | $26.16 |
| ut excluding multi- building apartment complexes or apartment buildings that have commercial stores or professional quarters in conjunction with commercial ventures such as nursing homes, motels, inc.) | $23.28 | $10.84 |
| ELEVATOR MECHANIC | $62.73 | $38.43 |
| POWER EQUIPMENT OPERATOR Group 01 | $48.70 | $39.10 |
| Group 02 | $47.57 | $39.10 |
| Group 03 | $43.09 | $39.10 |
| Group 04 | $43.15 | $39.10 |
| Group 05 | $43.15 | $39.10 |
| Group 06 | $51.45 | $39.10 |
| Group 07 | $43.80 | $34.95 |
| Group 08 | $44.10 | $34.95 |
| Group 09 | $49.70 | $39.10 |
| Group 10 | $45.25 | $34.95 |
| Group 11 | $50.70 | $39.10 |
| Group 12 | $51.70 | $39.10 |
| IRONWORKER | $41.65 | $31.18 |
| LABORER Group 1 | $32.35 | $32.38 |
| Group 2 | $32.85 | $32.38 |
| Group 3 | $33.85 | $32.38 |
| LABORERS Group 1 | $35.38 | $29.35 |
| Group 2 | $35.88 | $29.35 |
| Group 3 | $36.88 | $29.35 |
| LABORERS Group 1 | $32.84 | $27.89 |
| Group 2 | $33.34 | $27.89 |
| Group 3 | $34.34 | $27.89 |
| LABORERS Group 1 | $34.14 | $30.59 |
| Group 2 | $34.64 | $30.59 |
| Group 3 | $35.64 | $30.59 |
| LABORERS Group 1 | $33.43 | $27.30 |
| Group 2 | $33.93 | $27.30 |
| Group 3 | $34.93 | $27.30 |
| LABORERS Group 1 | $29.26 | $31.47 |
| Group 2 | $29.76 | $31.47 |
| Group 3 | $30.76 | $31.47 |
| PAINTER Building | $31.25 | $17.12 |
| Residential | $29.95 | $17.12 |
| GLAZIER | $43.32 | $25.43 |
| CEMENT MASON | $39.00 | $30.60 |
| PLASTERER | $37.30 | $24.75 |
| TERRAZZO WORKER/SETTER | $17.55 | $0.00 |
| TILE SETTER | $11.70 | $1.60 |
| PLUMBER/PIPEFITTER | $47.75 | $23.42 |
| PLUMBER | $43.75 | $21.25 |
| Steamfitter | $49.00 | $24.42 |
| PLUMBER/PIPEFITTER | $51.61 | $21.45 |
| ROOFER | $40.00 | $22.05 |
| Sprinkler Fitters | $54.23 | $31.45 |
| SPRINKLER FITTER | $50.51 | $30.25 |
| Sheet Metal Worker Building | $46.57 | $24.48 |
| Residential | $34.27 | $17.44 |
| TRUCK DRIVER Group 1 | $45.35 | $25.72 |
| Group 2 | $45.93 | $25.72 |
| Group 3 | $46.25 | $25.72 |
| Group 4 | $46.60 | $25.72 |
| Group 5 | $47.71 | $25.72 |
Related Wage Determinations
View directory →Davis-Bacon
IL20260002 (Rev 3)
Illinois • Alexander, Champaign, Christian +38
Davis-Bacon
IL20260054 (Rev 1)
Illinois • Perry, Randolph
Davis-Bacon
IL20260066 (Rev 2)
Illinois • Gallatin, Hardin, Pope
Davis-Bacon
IL20260057 (Rev 1)
Illinois • Monroe
Davis-Bacon
IL20260030 (Rev 1)
Illinois • Jersey
Davis-Bacon
IL20260032 (Rev 1)
Illinois • Johnson