Skip to content
Department of Agriculture

Sam Houston Trail Bridge Replacement

Solicitation: 127EAV26R0010
Notice ID: fcef42a391894435a84ba68e941d5024
TypePresolicitationNAICS 237990PSCZ2PZSet-AsideSBADepartmentDepartment of AgricultureAgencyForest ServiceStateTXPostedFeb 09, 2026, 12:00 AM UTCDueFeb 23, 2026, 07:00 PM UTCExpired

Presolicitation from FOREST SERVICE • AGRICULTURE, DEPARTMENT OF. Place of performance: TX. Response deadline: Feb 23, 2026. Industry: NAICS 237990 • PSC Z2PZ.

Market snapshot

Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.

12-month awarded value
$1,715,365,878
Sector total $37,340,646,106 • Share 4.6%
Live
Median
$2,373,471
P10–P90
$1,104,085$15,131,775
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
4.6%
share
Momentum (last 3 vs prior 3 buckets)
+116%($629,345,191)
Deal sizing
$2,373,471 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for TX
Live POP
Place of performance
Lufkin, Texas • 75904 United States
State: TX
Contracting office
Albuquerque, NM • 87102 USA

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
TX20260265 (Rev 0)
Match signal: state matchOpen WD
Published Jan 02, 2026Texas • Potter
Rate
BOILERMAKER
Base $33.17Fringe $24.92
Rate
CARPENTER
Base $28.57Fringe $9.30
+39 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 39 more rate previews.
Davis-BaconBest fitstate match
TX20260265 (Rev 0)
Open WD
Published Jan 02, 2026Texas • Potter
Rate
BOILERMAKER
Base $33.17Fringe $24.92
Rate
CARPENTER
Base $28.57Fringe $9.30
Rate
ELECTRICIAN (Excludes Low Voltage Wiring and Installation of Alarms)
Base $29.41Fringe $12.73
+38 more occupation rates in this WD
Davis-Baconstate match
TX20260216 (Rev 1)
Open WD
Published Jan 23, 2026Texas • Matagorda, Refugio
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.20Fringe $12.38
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.50Fringe $8.89
Rate
BOILERMAKER
Base $33.17Fringe $24.92
+23 more occupation rates in this WD
Davis-Baconstate match
TX20260139 (Rev 0)
Open WD
Published Jan 02, 2026Texas • Fayette
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $30.50Fringe $8.89
Rate
BOILERMAKER
Base $33.17Fringe $24.92
Rate
IRONWORKER (Reinforcing)
Base $29.64Fringe $8.43
+20 more occupation rates in this WD
Davis-Baconstate match
TX20260127 (Rev 0)
Open WD
Published Jan 02, 2026Texas • Cochran
Rate
ASBESTOS WORKER/HEAT & FROST INSULATOR
Base $33.23Fringe $7.52
Rate
Boilermaker
Base $33.17Fringe $24.92
Rate
IRONWORKER (Reinforcing)
Base $29.64Fringe $8.43
+20 more occupation rates in this WD

Point of Contact

Name
David Watson
Email
david.l.watson@usda.gov
Phone
480.204.9319

Agency & Office

Department
AGRICULTURE, DEPARTMENT OF
Agency
FOREST SERVICE
Subagency
Southwestern Regional Office, Region 3
Office
Not available
Contracting Office Address
Albuquerque, NM
87102 USA

More in NAICS 237990

Description

    • This Project includes all labor, materials, equipment, supplies, travel, supervision, and incidentals necessary for the full design and construction of (18) Trail Bridges on the MUT (Multi-Use Trail) of the Sam Houston National Forest west of New Waverly, TX.  Work includes:
      1. Phase A: Site Investigation and Analysis
      2. Phase B: Design and Construction Document Preparation
      3. Phase C: Removal and disposal of existing crossing infrastructure, construction of new crossings, and construction and connecting of trail approaches from the existing trail to the new crossings.
    • The contractor may adopt a phased approach to completion of the crossings due to the number of sites as well as the varied locations and potential varied crossing types proposed.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.