USCGC Bertholf Turbine CPU and Install
Combined Synopsis Solicitation from US COAST GUARD • HOMELAND SECURITY, DEPARTMENT OF. Place of performance: CA. Response deadline: Feb 12, 2026. Industry: NAICS 336611 • PSC J020.
Market snapshot
Awarded-market signal for NAICS 336611 (last 12 months), benchmarked to sector 33.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 336611
Description
THIS HAS BEEN AWARD VIA JOTFOC THIS IS FOR INFORMATIONAL PURPOSES ONLY.
TECHNICAL SERVICES TO REPAIR WOODWARD MicroNet NT CPU (PN 5466-409)
Background. CGC BERTHOLF is usable to start the Main Gas Turbine. While steaming at HP7 on the GT, a Micronet System Faulty (PV131047) alarm appeared on MCS-5 as well as a Hardware Chassis A Fan Fault on the GT Woodward panel. GT operation was not hindered. After securing the GT, MCMS alarmed with a GT Engine Control System (ECS) hardware fault prohibiting water wash from being completed. SF installed three new fans above the Micronet CPU and I/O cards and conducted a reset of the system IAW Woodward Operating Instructions from B91358OI.C with positive results. Again, while steaming in GT mode at HP5 the same sequence of alarms populated. After performing a CPU reset the ECS hardware fault did not clear and the GT is currently unable to start or motor. SF identified ECS alarm code to be "TRBL 20" in TP B91358OI.C, but no further troubleshooting steps are annotated in the manual. Request Woodward tech for CPU inspection and troubleshooting.
- Scope. 1 FS Engineer for two (4) ten (10) hour travel days and two (4) ten (10) hour days on two separate site visits for following:
- MicroNet NT CPU (PN 5466-409) inspection and troubleshooting.
- Provide new CPU 6466-1035.
- Perform CPU upgrade to Micro Net Plus CPU 5466-1035. This would include uploading new GAP software compatible with new CPU.
- Tasks. The contractor shall:
- Provide all technical and all proprietary data to troubleshoot and repair the CPU (PN 5466-409).
- Provide new CPU 6466-1035. Delivered to the address below (Estimated lead time of 6 weeks).
- Upgrade to Micro Net Plus on cutter.
- Provide field report within 5 working days of visits.
- Delivery. Deliver Parts to:
USCGC BERTHOLF
ATTN: SFLC LRE AMS
1 Eagle RD
Alameda CA 94501
- Place of performance-
1St Visit: 5 Calle la Puntilla, San Juan, PR, 00901
2nd Visit: TBD when part is on hand. Coordinate with POC listed.
- Period of performance- 1ST Visit: 21FEB2026- 22FEB2026
2nd Visit: TBD
- Points of Contact.
- USCG-SFLC-LRE PL Asset Management: CWO Matthew Temple, matthew.temple@uscg.mil, (510) 460-8195
- USCG-SFLC-LRE PL Asset Management: MKCM Armando Parez, Armando.Perez@uscg.mil, (571) 607-1558
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.