Skip to content
Employment Development Dept

IFB No. 125672 - Fire and Intrusion Alarm Monitoring, Annual Fire Alarm Inspection(s), and "As-Needed" Alarm Maintenance and Repairs Services

Solicitation: Not available
Notice ID: f97db249ba92420a9f02b005454d8cb3
DepartmentEmployment Development DeptStateCAPostedMar 02, 2026, 12:00 AM UTCDueApr 01, 2026, 10:00 PM UTCExpired

Federal opportunity from Employment Development Dept. Place of performance: CA. Response deadline: Apr 01, 2026.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,748,032,838
Sector total $2,748,032,838 • Share 100.0%
Live
Median
$345,024
P10–P90
$39,423$2,325,000
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,748,032,838)
Deal sizing
$345,024 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Map for CA
Live POP
Place of performance
297 West Hedding Street, San Jose, CA 95110
State: CA
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
CA20260007 (Rev 3)
Match signal: state matchOpen WD
Published Jan 23, 2026California • Alpine, Amador, Butte +21
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1
Base $84.76Fringe $25.07
Rate
Area 2
Base $64.56Fringe $25.07
+247 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 247 more rate previews.
Davis-BaconBest fitstate match
CA20260007 (Rev 3)
Open WD
Published Jan 23, 2026California • Alpine, Amador, Butte +21
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1
Base $84.76Fringe $25.07
Rate
Area 2
Base $64.56Fringe $25.07
Rate
handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not) AREA 1
Base $35.31Fringe $12.75
+246 more occupation rates in this WD
Davis-Baconstate match
CA20260012 (Rev 2)
Open WD
Published Jan 23, 2026California • San Luis Obispo
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+128 more occupation rates in this WD
Davis-Baconstate match
CA20260024 (Rev 2)
Open WD
Published Jan 23, 2026California • Orange
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+127 more occupation rates in this WD
Davis-Baconstate match
CA20260015 (Rev 2)
Open WD
Published Jan 23, 2026California • Ventura
Rate
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base $56.32Fringe $26.52
Rate
Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)
Base $39.94Fringe $20.65
Rate
terial handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Base $23.52Fringe $13.37
+127 more occupation rates in this WD

Point of Contact

Name
Dannielle Lecitona
Email
dannielle.lecitona@edd.ca.gov
Phone
916/657-5158
Name
Dannielle Lecitona
Email
dannielle.lecitona@edd.ca.gov
Phone
916/657-5158

Agency & Office

Department
Employment Development Dept
Agency
Not available
Subagency
Not available
Office
Not available
Contracting Office Address
Not available

Description

Fire and Intrusion Alarm Monitoring, Annual Fire Alarm Inspection(s), and "As-Needed" Alarm Maintenance and Repairs Services for the EDD Facility located at 297 West Hedding Street, San Jose, CA 95110

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.