USCG KETCHIKAN ELECTRICAL WORK

Solicitation: PierOneBaseKetchikan
Notice ID: f50983080a8d481abde0539caf6e145e

Combined Synopsis Solicitation from US COAST GUARD • HOMELAND SECURITY, DEPARTMENT OF. Place of performance: AK. Response deadline: Feb 27, 2026. Industry: NAICS 238210 • PSC J059.

Market snapshot

Awarded-market signal for NAICS 238210 (last 12 months), benchmarked to sector 23.

12-month awarded value
$6,861,289
Sector total $33,071,130,462 • Share 0.0%
Live
Median
$48,254
P10–P90
$7,365$2,168,480
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
0.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($6,861,289)
Deal sizing
$48,254 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for AK
Live POP
Place of performance
Ketchikan, Alaska • 99901 United States
State: AK
Contracting office
Ketchikan, AK • 99901 USA

Point of Contact

Name
DENO STAMOS
Email
deno.a.stamos@uscg.mil
Phone
Not available
Name
Contracting Officer - Benjamin Reedy
Email
benjamin.r.reedy@uscg.mil
Phone
Not available

Agency & Office

Department
HOMELAND SECURITY, DEPARTMENT OF
Agency
US COAST GUARD
Subagency
BASE KETCHIKAN(00035)
Office
Not available
Contracting Office Address
Ketchikan, AK
99901 USA

More in NAICS 238210

Description

SEE ATTACHED SPECS/SCOPE OF WORK---- 

Scope of Work: Electrical Inspection and Maintenance – Floating Pier One, Base Ketchikan

1. Objective:
Provide inspection, maintenance, and repair services for electrical systems associated with Floating Pier One, Base Ketchikan, with a focus on shore tie terminals and associated electrical lines.

2. Location:
Floating Pier One, Base Ketchikan. Berth 5

3. Tasks:

A. Shore Tie Terminal Maintenance

  • Inspect all shore tie terminals where vessels connect to shore power.
  • Identify and document any damage, corrosion, moisture intrusion, or other deficiencies.
  • Repair any identified issues to restore full functionality.
  • Dry and seal all shore tie terminals to prevent future moisture intrusion.
  • Test terminals for proper operation after repairs and sealing.

B. Electrical Line Inspection and Grooming

  • Inspect the electrical line running from the FRC Floating Pier Isolation Transfer to the shore tie terminals.
  • Clean and groom all accessible portions of the line, removing debris, corrosion, and contaminants.
  • Conduct a thorough inspection for physical damage, wear, or potential failure points.
  • Perform Megger (insulation resistance) testing on the electrical lines to identify any insulation breakdowns or other potential issues.
  • Document all findings and provide recommendations for further action if required.

4. Deliverables:

  • Written inspection report detailing findings, repairs performed, and recommendations for future maintenance.
  • Documentation of Megger test results and any corrective actions taken.
  • Photographic evidence of before and after conditions for all work performed.

5. Period of Performance:

  • Shore Tie Terminal inspection and maintenance shall be completed within two (2) weeks from award of contract.
  • Electrical line inspection, grooming, and cleaning shall be completed within three (3) weeks from award of contract.
  • Final written report of findings and actions  written(typed)  and documented shall be submitted within one (1) month from the start of the period of performance.

6. Safety and Compliance:

  • All work must comply with applicable electrical codes, safety standards, and Base Ketchikan requirements.
  • All personnel must be appropriately licensed and qualified for marine electrical work.

Quote/Estimate: Quote or Estimate shall include materials going up to 5,000K for any repairs in the shore tie terminal box on the floating pier, but not to exceed.

Question: Could you quantify the shore tie terminals and cable lengths from Isolation Transfer to each Terminal to refine labor/testing time.

answer to a contractors question 1.  

Good Afternoon Contracting Team,

The Shore tie Terminals is one box that has two plugs for shore ties. Approximate size is 4’x4’x2’ Not exact size of the box, but approximate.  

Approximate distance of the cable/ conduit run is 550’ plus or mins 20 feet.

Area of Concern: On map, it is South Float One (Berth 5 and Berth 10).

Base Ketchikan POC: LT Robert Marx and CWO Russell Dever.

***contact Senior Field Contracting Officer (SFCO ) DENO STAMOS AT  deno.a.stamos@uscg.mil if a site walk is required .

THIS IS A COMBINED SYNOPSIS SOLICIATION. RECEIPT OF BIDS VIA EMAIL IS DUE NO LATER THAN 26 FEBRUARY 2026 AT 3:00 PM ALASKA TIME ZONE,

NAICS  CODE: 238210
 FSC CODE:J059

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.