INTRACOASTAL WATERWAY MAINTENANCE DREDGING VICINITY OF BAKERS HAULOVER, MIAMI-DADE COUNTY, FLORIDA.
Solicitation from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: {"streetAddress":"","zip":""}. Response deadline: May 13, 2026. Industry: NAICS 237990 • PSC Z1KF.
Support routes that fit this solicitation
Market snapshot
Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
More in NAICS 237990
Description
THIS NOTICE IS POSTED FOR INFORMATIONAL PURPOSES ONLY: NOTICE OF INTENT TO ORDER: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER W912EP25R0010: AGM Marine Contractors Inc. (W912EP25D0011), AHTNA Marine and Construction Company LLC (W912EP25D0012), Atlantic and Gulf Dredging and Marine LLC (W912EP25D0013), Coastal Dredging Co., Inc. (W912EP25D0014), Cottrell Contracting Corporation (W912EP25D0015), Next Generation Logistics LLC. (W912EP25D0016), Southern Dredging Co, Inc. (W912EP25D0017), Southwind Corporation Corp. (W912EP25D0018) and Waterfront Property Servies LLC Gator Services (W912EP25D0019). DESCRIPTION OF WORK: Project consists of maintenance dredging the Intracoastal Waterway (IWW) channel and settling basin in the vicinity of Baker Haulover. Place excavated material in the beach placement area south of Bakers Haulover Inlet, as shown on the plans. Incidental work includes but not limited to environmental monitoring, water quality monitoring, benthic surveys, beach fill quality control, vibration control and monitoring, and beach tilling. The Request for Proposals (RFP) will be issued on or about 13 April 2026 and proposals will be due on or about 13 May 2026. NAICS Code 237990, Dredging and Surface Cleanup Activities. The Small Business Standard is $37 million. The Price Target Range is between $1,000,000.00 and $5,000,000.00. The period of performance associated with this requirement is: 100 calendar days after receipt of the Notice to Proceed (NTP). The contractor shall commence work within 60 calendar days of receipt of the Notice to Proceed (NTP). THIS IS A TOTAL SMALL BUSINESS SET-ASIDE REQUIREMENT.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.