Skip to content
Department of Transportation

NM IHS NAVAJO (1) Health Facilities Improvements

Solicitation: 6982AF26SS000005
Notice ID: ed2165dc27c749b99ba73fdfb6f11cb8
TypeSources SoughtNAICS 237990PSCY1LZDepartmentDepartment of TransportationAgencyFederal Highway AdministrationStateNMPostedApr 02, 2026, 12:00 AM UTCDueApr 15, 2026, 08:00 AM UTCCloses in 13 days

Sources Sought from FEDERAL HIGHWAY ADMINISTRATION • TRANSPORTATION, DEPARTMENT OF. Place of performance: NM. Response deadline: Apr 15, 2026. Industry: NAICS 237990 • PSC Y1LZ.

Market snapshot

Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.

12-month awarded value
$1,696,853,507
Sector total $36,819,308,737 • Share 4.6%
Live
Median
$19,671,409
P10–P90
$19,671,409$19,671,409
Volatility
Stable0%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
4.6%
share
Momentum (last 3 vs prior 3 buckets)
+113%($610,832,819)
Deal sizing
$19,671,409 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →
Map for NM
Live POP
Place of performance
Gallup, New Mexico • United States
State: NM
Contracting office
Lakewood, CO • 80228 USA

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
NM20260031 (Rev 1)
Match signal: state matchOpen WD
Published Jan 30, 2026New Mexico • Cibola, Guadalupe, Harding +3
Rate
Carpenter Drywall Hanging Only
Base $24.08Fringe $10.79
Rate
CARPENTER Drywall Hanging Only
Base $29.09Fringe $16.20
+40 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 40 more rate previews.
Davis-BaconBest fitstate match
NM20260031 (Rev 1)
Open WD
Published Jan 30, 2026New Mexico • Cibola, Guadalupe, Harding +3
Rate
Carpenter Drywall Hanging Only
Base $24.08Fringe $10.79
Rate
CARPENTER Drywall Hanging Only
Base $29.09Fringe $16.20
Rate
ELECTRICIAN Zone 1
Base $40.30Fringe $13.41
+39 more occupation rates in this WD
Davis-Baconstate match
NM20260015 (Rev 1)
Open WD
Published Jan 30, 2026New Mexico • Colfax
Rate
CARPENTER Drywall Hanging Only
Base $24.08Fringe $10.79
Rate
Power Equipment Operator (2) Roller(Dirt and Grade Compaction)
Base $26.75Fringe $4.65
Rate
Bobcat/Skid Loader
Base $27.70Fringe $4.65
+38 more occupation rates in this WD
Davis-Baconstate match
NM20260028 (Rev 1)
Open WD
Published Jan 30, 2026New Mexico • San Miguel
Rate
CARPENTER Drywall Hanging and Drywall Finishing/Taping Only
Base $24.08Fringe $10.79
Rate
ELECTRICIAN Zone 1
Base $40.30Fringe $13.41
Rate
Power Equipment Operator (2) Roller(Dirt and Grade Compaction)
Base $26.75Fringe $4.65
+38 more occupation rates in this WD
Davis-Baconstate match
NM20260030 (Rev 1)
Open WD
Published Jan 30, 2026New Mexico • Union
Rate
CARPENTER Drywall Hanging Only
Base $24.08Fringe $10.79
Rate
ELECTRICIAN Zone 1
Base $40.30Fringe $13.41
Rate
Power Equipment Operator (2) Roller(Dirt and Grade Compaction)
Base $26.75Fringe $4.65
+38 more occupation rates in this WD

Point of Contact

Name
Kelly Palmer
Email
cflacquisitions@dot.gov
Phone
Not available

Agency & Office

Department
TRANSPORTATION, DEPARTMENT OF
Agency
FEDERAL HIGHWAY ADMINISTRATION
Subagency
6982AF CENTRAL FEDERAL LANDS DIVISI
Office
Not available
Contracting Office Address
Lakewood, CO
80228 USA

More in NAICS 237990

Description

THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.

THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT  INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service-disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one (1) of these programs.  Interested businesses must submit the following by e-mail to CFLAcquisitions@dot.gov (Attn:  Kelly Palmer) for receipt by close of business (2:00 P.M.MDT) on April 15, 2026: 

(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;

(2) A list of all confirmed socioeconomic categories (i.e., 8(a), small-disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business;

(3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $30 million, and your firm’s aggregate bonding capacity; and

(4) Provide a list of medium-to-large construction projects of equal or greater value and scope to the NM IHS NAVAJO (1) Health Facilities Improvements project in which you performed high-value commercial parking lot reconstruction/rehabilitation in high-traffic, congested environments while maintaining uninterrupted public access. State whether your firm was the prime contractor or subcontractor on the project. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.

The size of a small business firm includes all parents, subsidiaries, affiliates, etc.  Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status.  All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/

NM IHS NAVAJO (1) Health Facilities Improvements

The project is in the Navajo Nation in Northeast New Mexico at various health facility sites.  The project area consists of  ten (10) discrete sites within the Navajo Nation. 

SCOPE OF THE WORK: 

The scope of the project includes rehabilitation and improvements to existing parking lots and pedestrian facilities at existing health facilities locations.  This includes rehabilitation of existing and/or construction of new asphalt concrete pavement, concrete pavement, concrete sidewalks and concrete curb and gutter.  This also includes construction of ADA/ABA compliant parking and ramps as well as installation of new regulatory signs.  The project will involve close coordination with each health facility to phase construction to minimize impacts to employees, patients, visitors and deliveries.  Additionally, the contractor will be limited to working on 2 to 3 sites concurrently. The contractor may choose the order of the sites subject to Gov’t approval, but they must fully complete construction at those active sites before moving on to subsequent locations.

PRINCIPAL WORK ITEMS:

  • 203 Removal of Pavement, Asphalt:  17,000 SQYD
  • 203 Removal of Pavement, Concrete:  600 SQYD
  • 203 Removal of Sidewalk, Concrete: 1,700 SQYD
  • 203 Removal of Curb and Curb and Gutter, Concrete:  3,000 LNFT
  • 403 Asphalt Concrete Pavement: 28,000 TON
  • 413 Asphalt Pavement Milling: 170,000 SQYD
  • 501 Minor Concrete Pavement: 4,500 SQYD
  • 609 Curb and Gutter: 7,000 LNFT
  • 610 Sidewalk, Concrete: 2,200 SQYD
  • 635 Public Information Program:  1 LPSM

ANTICIPATED SCHEDULE: 

Advertisement – January 2027

Award – February 2027

NTP – March 2027

Contract Completion – June 2029

Due to weather, no onsite work is anticipated between January and April 2028

ESTIMATED COST RANGE:

Total estimated cost between $20,000,000 and $30,000,000

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.