- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
OPS EAID GENERATOR REPLACEMENT
Solicitation from DEPT OF THE AIR FORCE • DEPT OF DEFENSE. Place of performance: NE. Response deadline: Feb 19, 2026. Industry: NAICS 335312 • PSC 6115.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 335312 (last 12 months), benchmarked to sector 33.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 335312
Description
Amendment 0002 13FEB2026 - Amended Performance Work Statement document into a Statement of Need. Removed the need for paralleling harness. Removed service component of requirement. See Statement of Need for full requirement scope. Added Attachment 04 - Question and Answer - 2.13.26.
Amendment 0001 09FEB2026 - 52.212-1 Amended in solicitation to reflect new questions due date of 12FEB2026 by 10:00 AM.
This requirement is for two (2) 200kW generators. The generators to be replaced are at the end of their service life and need to be replaced by more efficient and EPA compliant generators.
The following items shall be provided: 2 each, Cummins C200D2RE: T4F Mobile 200 kW standby output/ 180 kW prime output; 60Hz: Cummins QSB 6.7L generators (available via GSA) and paralleling harness.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Department of the Air Force has issued a solicitation for the replacement of two obsolete 200kW generators, specifically requiring Cummins C200D2RE generators with a focus on efficiency and EPA compliance. Amendments to the solicitation have clarified the scope of work, removing the need for paralleling harnesses and service components. The response deadline is set for February 19, 2026, at 4:00 PM UTC.
The buyer aims to acquire modern, efficient, and EPA-compliant generators to replace outdated units that have reached the end of their service life.
- Review the Statement of Need and amendments thoroughly.
- Prepare a proposal including specifications for the Cummins C200D2RE generators.
- Ensure compliance with efficiency and EPA standards.
- Submit the proposal by the response deadline.
- Completed proposal including technical and pricing info for two Cummins C200D2RE generators.
- Evidence of compliance with EPA standards.
- Company credentials and past performance references.
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Clarification on the period of performance for the contract.
- Details on any follow-up support or services required after installation.
- Unclear if additional documentation is needed beyond what is stated in the checklist.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.