Skip to content
Department of the Interior

Y--CASA 324271, Castillo de San Marco National Monume

Solicitation: 140P2026R0016
Notice ID: eb222ed3c1b34268870cc802794cdd54
TypeSolicitationNAICS 237990PSCY1PZSet-AsideSBADepartmentDepartment of the InteriorAgencyNational Park ServicePostedJan 08, 2026, 12:00 AM UTCDueJan 23, 2026, 10:00 PM UTCExpired

Solicitation from NATIONAL PARK SERVICE • INTERIOR, DEPARTMENT OF THE. Place of performance: {"city":{},"state":{},"country":{}}. Response deadline: Jan 23, 2026. Industry: NAICS 237990 • PSC Y1PZ.

Market snapshot

Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.

12-month awarded value
$1,287,533,718
Sector total $33,095,080,127 • Share 3.9%
Live
Median
$551,853
P10–P90
$43,045$119,860,900
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
3.9%
share
Momentum (last 3 vs prior 3 buckets)
+48369%($1,282,231,886)
Deal sizing
$551,853 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on SAM.gov →

Description

CASA 324271, Castillo de San Marco National Monument, Repair and Raise Seawall

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Jan 08, 2026
Executive summary

This opportunity is for the repair and elevation of the seawall at Castillo de San Marco National Monument under the National Park Service. The solicitation is designated for Small Business Administration (SBA) set-aside, with a response deadline set for January 23, 2026.

What the buyer is trying to do

The National Park Service aims to repair and raise the seawall at the Castillo de San Marco National Monument to enhance coastal resilience and protect the historical site from erosion and flooding.

Work breakdown
  • Site assessment and survey of the existing seawall
  • Design modifications to enhance seawall elevation and durability
  • Construction of the new seawall
  • Project management and compliance with NPS regulations
  • Post-construction evaluation and reporting
Response package checklist
  • Completed proposal form as per solicitation
  • Technical approach to seawall design and construction
  • Cost proposal including materials and labor
  • Proof of relevant past performance
  • Valid licenses and certifications
Suggested keywords
coastal constructionmarine engineeringhistorical preservationseawall repairNPS contracting
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed specifications of the seawall design
  • Projected timeline for completion of work
  • Estimated budget range for the project
  • Evaluation criteria for proposals
  • List of required permits and approvals

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.