NJIWW CM Bank Stabilization & PPC Rip Rap
Presolicitation from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: NJ. Response deadline: Feb 26, 2026. Industry: NAICS 237990 • PSC Y1KB.
Market snapshot
Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 237990
Description
W912BU26BA010 Synopsis:
REQUIREMENT:
The U.S. Army Corps of Engineers (USACE), Philadelphia District (NAP), anticipates a requirement for a firm fixed-price service contract for New Jersey Intracoastal Waterway Bank/Shoreline Stabilization Cape May Canal/Point Pleasant Canal in Cape May, NJ The estimated magnitude of this project is between $1,000,000 and $5,000,000.
This is a Pre-Solicitation Notice. This Notice is being issued for planning and information purposes only. This notice is not a Solicitation, nor is to be construed as a commitment by the Government. The Government will not pay for any effort expended in responding to this notice, nor will the Government accept proposal as a result of this notice.
PROJECT DESCRIPTION:
The U.S. Army Corps of Engineer (USACE), Philadelphia District (NAP), anticipates a requirement for New Jersey Intracoastal Waterway Bank/Shoreline Stabilization Cape May Canal/Point Pleasant Canal in Cape May, NJ.
(1) The previous proposed work under solicitation W912BU25RA013 designed a repair of approximately 500 linear feet of degraded bank stabilization along the Cape May Canal which is part of the NJIWW FNC. The revised design will reduce the length of the repair to approximately 220 linear feet and reduce the width of the structure’s toe into the canal. Currently, the bank is stabilized by a revetment composed of corroded and degraded gabion baskets and is considered failed. The repair work will include the excavation of sediment from below the mean high-water line (temporarily stockpiled), removal of the twisted-wire gabion baskets and associated stone, and placement of the rock mattresses. Grade will be met with additional riprap stone, the existing gabion stone, and sand, where applicable. After the armoring has been completed, the site will be stabilized and planted.
(2) New Jersey Intracoastal Waterway (Point Pleasant Canal): The proposed work under solicitation W912BU25RA013 included placement of riprap along the Point Pleasant Bulkhead at the Manasquan Entrance, which is part of the NJIWW FNC.The riprap is necessary for increased stability and longevity of the sheetpile wall at a location with large scour holes and a history of erosion. Revised plans & specs are under review, but no significant changes are anticipated for the rip rap placement design included in the prior solicitation.
The estimated period of performance is 365 calander days from Notice to Proceed NTP,
The anticipated North American Industrial Classification System (NAICS) code is 237990, Other Heavy and Civil Engineering Construction, Size Standard: $45 million
TYPE OF SET ASIDE: Total Small Business Set-Aside
ADDITIONAL INFORMATION: Specific information pertaining to this procurement will be available in the Solicitation. The Solicitation documents will be posted on the SAM.gov website. It is, and will continue to be, the responsibiity of all potential Offerors to monitor the SAM.gov website for any amendments, updates, responses to industry questions/comments, etc. The Government will not be maintaining a mailing list.
POINT-OF-CONTACT: The Contract Specialist for this Solicitation is Molly Gallagher, email: Molly.Gallagher@usace.army.mil. Any communication regarding this notice should be made in writing sent via email and must identify the Solicitation number, company name, address, phone number and point of contact.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.