Lexington Harbor Breakwater Repair
Solicitation from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: 48450. Response deadline: Mar 05, 2026. Industry: NAICS 237990 • PSC Y1PZ.
Market snapshot
Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 237990
Description
***Amendment 0002 is issued to extend the bid due date, extend the bid opening date, incorporate Davis-Bacon Act Wage Determination MI20260049, extend the Request for Information period, revise drawing and specification sheets, provide images of the work site without snow cover, provide the site visit attendee list. Reference the amendment document for full details. ***Amendment 0001 is issued to remove FAR Clause 52.236-27 - Site Visit (Construction) and to provide organized site visit information within Section 00 21 13 - Instructions to Bidders. Reference the amendment for full details.*** Lexington Harbor Breakwater Repair. This project includes breakwater repair operations at Lexington Harbor. The north breakwater is a permeable rubble mound structure and allows sand shoaling within the harbor. Voids in the north breakwater are exacerbating sediment infiltration within the harbor. A walkway is present atop the north breakwater. The walkway is approximately 5 feet wide and generally in good condition. The north breakwater voids are partially sand filled. The sand fill depth varies; however, sand generally extends to the existing water elevation. The project objective is to alter the existing permeable rubble mound breakwater structure to an impermeable structure. The proposed scope of work includes constructing a grout curtain wall within the structure. The proposed grout curtain wall is chemical grout and a cementitious grout material. The chemical grout material is proposed within the sand filled breakwater structure. The cementitious grout material is proposed above the sand filled area. The intent of the grout curtain wall is to prevent sand from infiltrating through the breakwater structure. The existing Portland cement concrete walkway is reconstructed upon completion of grouting operations. As previously stated, the project includes breakwater repair by constructing a grout curtain wall and Portland cement concrete walkway reconstruction. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on ?View FFP Contract Changes Playbook Here?.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.