- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
CENTAM Guardian26 Line Haul HND SLV "Subject to Availabilities of Funds"
Combined Synopsis Solicitation from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: Honduras. Response deadline: Feb 27, 2026. Industry: NAICS 48411 • PSC V112.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 48411
Description
*FUNDS ARE NOT PRESENTLYAVAILABLE FOR THIS REQUIREMENT ANDIS SUBJECT TO AVAILABILITY OF FUNDS IN ACCORDANCE WITH FAR 52.232-18*
The Regional Contracting Office-Soto Cano is seeking to obtain support to provide Line Haul Service between Soto Cano Air Base, Honduras to Multiple Locations in El Salvador.
Contractor shall provide non-personal services The Contractor shall provide all personnel, equipment, supplies, facilities, flatbeds, lowboys, Removable Goose Neck (RGN), 10K forklift with extended forks at least 72 inches, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Contractor line haul services with drivers to transport supplies, materials, equipment, and containers safely and expeditiously to include where the Contractor shall coordinate with Soto Cano AB, JTF-B J-4 to accurately process all required entry passes documentation for deployment and redeployment before equipment arrival. The Contractor shall accomplish all services in coordination with the COR as defined in this PWS. The Contractor shall perform to the standards in this contract.
POP: 07 April 2026 -15 May 2026
Performance Work Statement Has Been Updated
Four changes are listed below:
1. Para 4.4
From: two (2) pressure washers
To: Six (6) pressure washers
2. Para 5.2.3.13
From: 5.2.3.13. Line Haul APOE Deployment: Pick up from Ilopango El Salvador, (FOS) site will be conducted on/about 6 April and On/about 28 April 2026. On 09 April pick up from Ilopango and deliver to 4 Abrigada de Infanteria el Paraiso Chalatenango. Will also drop of at La Union. COR will keep contractor abreast of time and dates of aircraft arrival.
To: From 5.2.3.13. Line Haul APOE Deployment: Pick up from Ilopango El Salvador, (FOS) site will be conducted on/about 6 April and On/about 28 April 2026. On about 12 April pick up from Ilopango and deliver to 4 Abrigada de Infanteria el Paraiso Chalatenango. Will also drop of at La Union. COR will keep contractor abreast of time and dates of aircraft arrival.
3. Para 5.2.3.17.a
From: Honduras Equipment Requirements: The contractor shall provide six (6) pressure washers (minimum 90 PSI) as well as any additional equipment and personnel to ensure that the equipment is 100% free of pest infestations, soil, and dirt both inside and outside the container, including lip areas, recessed sections, ledges, wheel wells, axles, undercarriage, and other common areas that may accumulate dirt.
To: Ilopango El Salvador Equipment Requirements: The contractor shall provide six (6) pressure washers (minimum 90 PSI) as well as any additional equipment and personnel to clean and ensure that the equipment is 100% free of pest infestations, soil, and dirt both inside and outside the container, including lip areas, recessed sections, ledges, wheel wells, axles, undercarriage, and other common areas that may accumulate dirt.
4. Deliverables Schedule #8
From: Honduras Equipment Requirements: The contractor shall provide six (6) pressure washers (minimum 90 PSI) as well as any additional equipment and personnel to ensure that the equipment is 100% free of pest infestations, soil, and dirt both inside and outside the container, including lip areas, recessed sections, ledges, wheel wells, axles, undercarriage, and other common areas that may accumulate dirt.
To: Ilopango El Salvador Equipment Requirements: The contractor shall provide six (6) pressure washers (minimum 90 PSI) as well as any additional equipment and personnel to clean and ensure that the equipment is 100% free of pest infestations, soil, and dirt both inside and outside the container, including lip areas, recessed sections, ledges, wheel wells, axles, undercarriage, and other common areas that may accumulate dirt.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.