- Gap review, remediation roadmap, and implementation support
- Policy package, evidence mapping, and submission prep
- Designed for primes and subs across non-tech and tech work
W91237-26-Q-A009 - Sewage Pumping Services for Burnsville Lake 2026-2030
Combined Synopsis Solicitation from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: WV. Response deadline: Jan 26, 2026. Industry: NAICS 562991 • PSC S222.
CMMC support options for this DoD solicitation
As DoD CMMC rollout expands, approximately 80%+ of DoD solicitations are expected to include cybersecurity/CMMC requirements, including many non-tech scopes.
- Structured checklist, AI guidance, and progress tracking
- Build evidence and controls with clearer next-step workflows
- Ideal for teams that want speed plus affordability
Market snapshot
Awarded-market signal for NAICS 562991 (last 12 months), benchmarked to sector 56.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 562991
Description
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The opportunity involves providing sewage pumping services at Burnsville Lake for a contract period spanning 2026-2030. The procurement falls under the Department of the Army, specifically through the Army Corps of Engineers, and targets vendors who comply with SBA set-aside requirements.
The buyer aims to secure reliable sewage pumping services to ensure continuous and effective waste management at Burnsville Lake, which is likely tied to both environmental and operational standards.
- Assess current sewage pumping infrastructure
- Plan and implement sewage pumping operations
- Ensure compliance with environmental regulations
- Coordinate with local agencies
- Regular performance reporting and maintenance management
- Company profile and qualifications
- SBA certification documents
- Relevant project experience
- Proposed project management plan
- Cost proposal including all associated expenses
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Full scope of work details
- Existing infrastructure conditions
- Local environmental regulations impact
- Past performance requirements
- work hours and service frequency
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.