Virtual Industry Day: ERCIP Lake City Army Ammunition Plant Microgrid and Combined Heat and Power
Special Notice from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: MO. Response deadline: Mar 05, 2026. Industry: NAICS 237130 • PSC Y1NZ.
Market snapshot
Awarded-market signal for NAICS 237130 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 237130
Description
Please join us March 5, 2026, for a virtual Industry Day hosted by the Louisville District Office for the ERCIP Lake City Army Ammunition Plant Microgrid and Combined Heat and Power Construction Project.
Please see the related notice for more information on the project that has been posted to SAM.gov.
Description: The proposed project is a Design-Bid-Build construction of a microgrid system powered by two 7.5 MW combined heat and power (CHP) combustion turbines with dual-fuel capable natural gas and propane fuel systems that make a 15 MW CHP power/heat production plant. The CHP will include heat recovery steam generators (HRSGs) and supplemental exhaust duct firing along with a black start diesel generator. The project will include all electrical distribution equipment and underground duct bank needed to connect to the existing electrical infrastructure. Microgrid controls will be installed to manage various modes of operation to include parallel mode with existing utility, island mode, and black start mode. The microgrid control system will be state of the art and will be integrated with two existing substations at four points of common coupling for seamless operation and load shed capability with the ability to island during a utility grid outage and leverage load shedding to balance microgrid supply and demand during islanded operation, and resynchronization with the grid upon grid restoration.
The project will install all piping and equipment needed to connect the CHP to the installation’s existing natural gas, steam, condensate, and water infrastructure and operate in tandem with the installation’s existing central heating plant. The microgrid will have industrial grade controls with a new control room located in the central heating plant. Environmental controls will be through the use of low NOx turbines and duct burners. The project also includes backup propane fuel storage/supply system, site improvements, demolition, full air permitting, communications, cybersecurity, and full commissioning.
NAICS CLASSIFICATION CODES: 237130 – Power and Communication Line and Related Structures Construction.
MEETING DATE & TIME: Thursday, March 5, 2026, 10:00 a.m. Eastern Time
MEETING LOCATION (virtual): https://dod.teams.microsoft.us/l/meetup-join/19%3adod%3ameeting_535d110d5bff49469cd7a10aaa6cd28a%40thread.v2/0?context=%7b%22Tid%22%3a%22fc4d76ba-f17c-4c50-b9a7-8f3163d27582%22%2c%22Oid%22%3a%2202f84320-aff8-4c84-b2dc-d5f42e7588ac%22%7d
Meeting ID: 993 303 014 471
Passcode: yK3HA9oc
Dial in by phone
+1 601-262-2433,,434842802# United States, Vicksburg
Find a local number
Phone conference ID: 434 842 802#
REGISTER: All vendors who plan to attend the Industry Day are requested to notify Alexa Dukes at alexa.l.dukes@usace.army.mil with the following information: company name(s), UEI(s), number of attendees, and names of attendees. Please submit this information NLT Tuesday 3 March 2026 at 2:00pm Eastern Time.
Please provide the following information to register:
Name:
Company:
Email:
Phone Number:
Prime or Subcontractor:
QUESTIONS: We welcome your questions. Email any questions to alexa.l.dukes@usace.army.mil. Please note that the SAM.gov posting will be updated to include the Industry Day Presentation following the completion of the Industry Day.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.