Bolivar County, Mississippi, FC/MR&T, EBMRL, Seepage Remediation, Francis to Round Lake, Item 615-L
Special Notice from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: MS. Response deadline: Feb 18, 2026. Industry: NAICS 237990 • PSC Y1PZ.
Market snapshot
Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 237990
Description
**AMENDMENT 0003 ISSUED 30 JANUARY 2026 - PROPOSAL DUE DATE EXTENDED**
**AMENDMENT 0002 ISSUED 15 JANUARY 2026 - REVISED DRAWINGS**
**AMENDMENT 0001 ISSUED 13 JANUARY 2026**
BOLIVAR COUNTY, MISSISSIPPI, FC/MR&T, EBMRL, SEEPAGE REMEDIATION, FRANCIS TO ROUND LAKE, ITEM 615-L
This notice is being provided for subcontracting opportunities only. Proposals will not be considered from any firms other than the FY 25 MATOC for Mississippi River Levees, Construction of Levee Enlargements and Berms contract holders. Those contractors are listed below:
W912EE25D0001
Affolter Contracting Company, Inc.
4629 FM Texas Ave
La Marque, TX 77568-3031
409-938-3838
W912EE25D0002
B&K Construction Company, LLC
1905 Highway 59
Mandeville, Louisiana 70448-1990
985-626-1866
W912EE25D0003
Circle, LLC
1204 Engineers Road
Belle Chasse, Louisiana 70037-3164
504-416-4542
W912EE25D0004
Tarpan Construction, LLC
6756 Highway 29
Cottonport, Louisiana 71327-4228
318-359-7086
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
This opportunity involves subcontracting for seepage remediation in Bolivar County, Mississippi, under the supervision of the U.S. Army Corps of Engineers. The proposal deadline has been extended to February 18, 2026, and only holders of the FY 25 MATOC for Mississippi River Levees are eligible to submit. Amendments have provided revisions on the project scope, including updated drawings and clarifications.
The buyer aims to procure subcontracting services for seepage remediation from pre-approved contractors under the existing MATOC for Mississippi River Levees.
- Review project amendments and drawings
- Assess subcontracting opportunities available to FY 25 MATOC holders
- Prepare and submit proposals by the extended deadline
- Coordinate with eligible prime contractors on scope and pricing
- Completed proposal documents
- Incorporation of all project amendments
- Evidence of compliance with SBA requirements
- Pricing breakdown aligned with project specifications
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Details on the specific seepage remediation requirements
- Information regarding project performance period
- Clarification on funding availability
- Potential environmental concerns related to the project
- Any unique qualifications or past performance metrics needed for subcontractors
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.