Bolivar County, Mississippi, FC/MR&T, EBMRL, Seepage Remediation, Francis to Round Lake, Item 615-L
Special Notice from DEPT OF THE ARMY • DEPT OF DEFENSE. Place of performance: MS. Response deadline: Feb 18, 2026. Industry: NAICS 237990 • PSC Y1PZ.
Market snapshot
Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
More in NAICS 237990
Description
**AMENDMENT 0004 ISSUED 02 FEBRUARY 2026 - REVISED SPECS & DRAWINGS**
**AMENDMENT 0003 ISSUED 30 JANUARY 2026 - PROPOSAL DUE DATE EXTENDED**
**AMENDMENT 0002 ISSUED 15 JANUARY 2026 - REVISED DRAWINGS**
**AMENDMENT 0001 ISSUED 13 JANUARY 2026**
BOLIVAR COUNTY, MISSISSIPPI, FC/MR&T, EBMRL, SEEPAGE REMEDIATION, FRANCIS TO ROUND LAKE, ITEM 615-L
This notice is being provided for subcontracting opportunities only. Proposals will not be considered from any firms other than the FY 25 MATOC for Mississippi River Levees, Construction of Levee Enlargements and Berms contract holders. Those contractors are listed below:
W912EE25D0001
Affolter Contracting Company, Inc.
4629 FM Texas Ave
La Marque, TX 77568-3031
409-938-3838
W912EE25D0002
B&K Construction Company, LLC
1905 Highway 59
Mandeville, Louisiana 70448-1990
985-626-1866
W912EE25D0003
Circle, LLC
1204 Engineers Road
Belle Chasse, Louisiana 70037-3164
504-416-4542
W912EE25D0004
Tarpan Construction, LLC
6756 Highway 29
Cottonport, Louisiana 71327-4228
318-359-7086
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
This opportunity pertains to seepage remediation work in Bolivar County, Mississippi, as part of the FC/MR&T project under the Department of the Army, specifically targeting the area from Francis to Round Lake. Notably, proposals will only be considered from contractors holding current Multiple Award Task Order Contracts (MATOCs) for Mississippi River Levees. Recent amendments have introduced revised specifications and extended the proposal deadline to February 18, 2026.
The buyer is seeking subcontractors to assist with seepage remediation efforts as part of a larger levee construction and enhancement project, specifically through Item 615-L.
- Review revised specifications and drawings from amendments.
- Identify key personnel and subcontracting firms for collaboration.
- Develop a detailed response plan addressing scope requirements.
- Prepare necessary documentation for compliance with SBA set-aside regulations.
- Cover letter outlining capabilities and interest.
- Appendix with experience in aquatic environment projects.
- Detailed pricing proposal reflecting labor and materials.
- Compliance certifications relevant to government contracting.
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed scope of work for seepage remediation is not provided.
- Exact start and end dates of the project are missing.
- Further clarification needed on project budget specifics.
- Information on site conditions or environmental concerns not mentioned.
- Parameters for subcontractor collaboration are unclear.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.