PAINTS AND FLOORS FOR GOVERNMENT HOUSING
Combined Synopsis Solicitation from US COAST GUARD • HOMELAND SECURITY, DEPARTMENT OF. Place of performance: MA. Response deadline: Jan 30, 2026. Industry: NAICS 23832 • PSC Z2FA.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
1.1 SCOPE: The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to paint interior and exterior surfaces and refinish interior hardwood flooring at (20) selected USCG Base Cape Cod Housing units in Bourne, MA 02542.
SEE SOW FOR FULL DETAILS
1.1.2 REQUIRED WORK: This list should not be considered complete. It represents the general items needed to complete the contract requirements.
- Prep and paint all interior surfaces to include: walls, ceilings, doors, closets, trim, windows, moldings, bulkhead/cellar ways, bulkhead/cellar steps, basement walls and basement floors.
- Prep and paint all exterior doors and door trim.
- If a home has a garage, prep and paint garage exterior entry doors and door trim, and interior finished walls.
- Paint selection and finish shall be IAW the following:
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
This opportunity involves providing painting and flooring refinishing services for 20 housing units at USCG Base Cape Cod. The performance period includes start and end dates yet to be determined, with a response deadline set for January 30, 2026. Proposals should align with the specifications detailed in the scope of work, including preparation and painting of interior and exterior surfaces.
The US Coast Guard aims to contract a company to manage the painting of both interior and exterior surfaces and refinishing hardwood flooring for designated housing units in Bourne, MA.
- Prepare and paint all interior surfaces including walls, ceilings, doors, and trim.
- Paint exterior doors and door trims.
- Refinish interior hardwood flooring.
- Completed proposal detailing capabilities and experience.
- Pricing details conforming to the solicitation requirements.
- Past performance references from similar projects.
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Start and end dates for the performance period.
- Specific technical requirements for paint and finishes.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.