Helena National Forest - Park Lake Dam Rehabilitation
Combined Synopsis Solicitation from FOREST SERVICE • AGRICULTURE, DEPARTMENT OF. Place of performance: MT. Response deadline: Feb 16, 2026. Industry: NAICS 237990 • PSC Z2KA.
Market snapshot
Awarded-market signal for NAICS 237990 (last 12 months), benchmarked to sector 23.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 25 more rate previews.↓
Point of Contact
Agency & Office
More in NAICS 237990
Description
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Helena National Forest is seeking rehabilitation services for the Park Lake Dam under solicitation number 1240LU26Q0013. This opportunity has been set aside for SBA small businesses and has a response deadline of February 16, 2026. Interested bidders can find more information and resources through the specified links and the agency's buyer website.
The buyer aims to engage qualified contractors to perform rehabilitation work on the Park Lake Dam, ensuring compliance with regulatory standards and enhancing the infrastructure's safety and functionality.
- Small businesses with experience in dam rehabilitation or similar civil engineering projects
- Contractors familiar with environmental and regulatory compliance for forest service projects
- Assess current structural integrity of Park Lake Dam
- Develop rehabilitation plan
- Execute rehabilitation services as outlined in the plan
- Conduct post-rehabilitation inspections and evaluations
- Completed Technical Proposal
- Cost Proposal
- Past Performance Information
- SBA Certification Documentation
- Ensure compliance with SBA small business requirements
- Adhere to Forest Service regulations during project execution
- Develop a competitive pricing model that reflects the scope of rehabilitation work
- Consider including a detailed breakdown of costs associated with labor and materials
- Partner with environmental engineers for regulatory compliance
- Include subcontractors specialized in dam safety inspections
- Potential delays due to environmental assessments
- Compliance with federal and local regulations may impact project timeline
- What specific rehabilitation requirements does the Forest Service anticipate for the Park Lake Dam?
- Are there historical assessments or reports available on the existing condition of the dam?
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific details on the required rehabilitation work
- Past performance requirements
- Expected project timeline
- Exact performance location
- Any mandatory certifications or licenses needed for the bid
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.